Fayette County · Zoning Ordinance
Part II - COUNTY CODE / Part B - LAND DEVELOPMENT AND LAND USE / Chapter 104 - DEVELOPMENT REGULATIONS / Article IX - SOIL EROSION, SEDIMENTATION AND POLLUTION CONTROL ORDINANCE / Division 6 - PENALTIES AND INCENTIVES
Sec. 104-360. Stop work orders.
About this text
- As published by Municode, current through 2026-05-28
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) For the first and second violations of this article the director or local issuing authority shall issue a written warning to the violator. The violator shall have five days to correct the violation. If the violation is not corrected within five days, the director or local issuing authority shall issue a stop work order requiring that all activities be stopped until necessary corrective action or mitigation has occurred. If the violation presents an imminent threat to public health or state or if the land disturbing activities are conducted without obtaining the necessary permit, the director or local issuing authority shall issue an immediate stop work order in lieu of a warning.
(b) For a third and any subsequent violation, the director or local issuing authority shall issue an immediate stop work order.
(c) All stop work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred.
(d) All such stop work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred.
When a violation in the form of taking action without a permit, failure to maintain a stream buffer, or significant amounts of sediment, as determined by the local issuing authority or by the director or his designee, have been or are being discharged into state waters and where BMPs have not been properly designed, installed and maintained, a stop work order shall be issued by the local issuing authority or by the director or his designee. Such stop work orders shall apply to all activity on the site with the exception of the installation and maintenance of temporary or permanent erosion and sediment controls.
History
(Code 1992, § 8-260; Ord. No. 2004-02, § 1, 2-26-2004; Ord. No. 2010-03, § 1, 5-27-2010)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.