--- title: Fayette County Zoning Ordinance, Sec. 104-433. Definitions collection: local-codes id: local-code:fayette-county/zoning/104-433 cite_as: Fayette County, Ga., Zoning Ordinance § 104-433 canonical_url: https://georgiacommons.org/code/local/fayette-county/zoning/104-433 md_url: https://georgiacommons.org/code/local/fayette-county/zoning/104-433.md text_url: https://georgiacommons.org/code/local/fayette-county/zoning/104-433/text source_url: https://library.municode.com/ga/fayette_county/codes/code_of_ordinances date: 2026-05-28 status: active jurisdiction: county:fayette jurisdiction_name: Fayette County county_fips: "13113" corpus_version: local-codes-fayette-county-a7a551bedadd publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/fayette-county/zoning/~part-ii/~part-b/~chapter-104/~article-x.md previous: https://georgiacommons.org/code/local/fayette-county/zoning/104-432.md next: https://georgiacommons.org/code/local/fayette-county/zoning/104-434.md index: https://georgiacommons.org/code/local/fayette-county.md branch: zoning edition: As published by Municode, current through 2026-05-28 edition_date_kind: current_through source_publisher: Municode version_id: local-code:fayette-county/zoning/104-433@2026-05-28-c2cee15077 --- # Fayette County Zoning Ordinance, Sec. 104-433. Definitions > As published by Municode, current through 2026-05-28 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - COUNTY CODE / Part B - LAND DEVELOPMENT AND LAND USE / Chapter 104 - DEVELOPMENT REGULATIONS / Article X - DAM AND ARTIFICIAL BARRIER DESIGN SPECIFICATIONS AND PERMIT REQUIREMENTS The following definitions are restated from the state department of natural resources, environmental protection division, chapter 391-3-8, Rules for Dam Safety: Category I means the classification of a dam where improper operation or failure would result in probable loss of human life. Situations constituting "probable loss of life" are those situations involving inundation of frequently occupied structures or facilities, including, but not limited to, residences, commercial and manufacturing facilities, schools and churches. Category II means the classification of a dam where improper operation or dam failure would not be expected to result in probable loss of human life. Dam means, with the exception of the exemptions outlined in Georgia Safe Dams Act of 1978 (O.C.G.A. § 12-5-372), the following: (1) Any artificial barrier, including appurtenant works, which impounds or diverts water and which the improper operation or failure of such would result in probable loss of human life as determined pursuant to the Georgia Safe Dams Act of 1978 (O.C.G.A. § 12-5-370 et seq.), and which: a. Is 25 feet or more in height from the downstream toe or lowest elevation of the outside limit of the barrier to the maximum water storage elevation; or b. Has an impounding capacity at maximum water storage elevation of 100 acre-feet or more. (2) Any artificial barrier, including appurtenant works, constructed in conjunction with the reclamation of surface mined land, and meeting the requirements of subsection (1) of this definition, and when improper operation or failure would result in probable loss of human life. Embankment means a wall or bank built to impound water. Impoundment means the water or liquid substance that is or will be stored by a dam, commonly referred to as the reservoir. ## History (Code 1992, § 8-302; Ord. No. 2012-03, § 1, 3-22-2012)