--- title: Fayette County Zoning Ordinance, Sec. 104-436. Permit requirements collection: local-codes id: local-code:fayette-county/zoning/104-436 cite_as: Fayette County, Ga., Zoning Ordinance § 104-436 canonical_url: https://georgiacommons.org/code/local/fayette-county/zoning/104-436 md_url: https://georgiacommons.org/code/local/fayette-county/zoning/104-436.md text_url: https://georgiacommons.org/code/local/fayette-county/zoning/104-436/text source_url: https://library.municode.com/ga/fayette_county/codes/code_of_ordinances date: 2026-05-28 status: active jurisdiction: county:fayette jurisdiction_name: Fayette County county_fips: "13113" corpus_version: local-codes-fayette-county-a7a551bedadd publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/fayette-county/zoning/~part-ii/~part-b/~chapter-104/~article-x.md previous: https://georgiacommons.org/code/local/fayette-county/zoning/104-435.md next: https://georgiacommons.org/code/local/fayette-county/zoning/104-437.md index: https://georgiacommons.org/code/local/fayette-county.md branch: zoning edition: As published by Municode, current through 2026-05-28 edition_date_kind: current_through source_publisher: Municode version_id: local-code:fayette-county/zoning/104-436@2026-05-28-ed9376cb6b --- # Fayette County Zoning Ordinance, Sec. 104-436. Permit requirements > As published by Municode, current through 2026-05-28 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - COUNTY CODE / Part B - LAND DEVELOPMENT AND LAND USE / Chapter 104 - DEVELOPMENT REGULATIONS / Article X - DAM AND ARTIFICIAL BARRIER DESIGN SPECIFICATIONS AND PERMIT REQUIREMENTS (a) Any dam proposed for construction in unincorporated the county must be approved by the state safe dams office under the requirements of the rules for safe dam prior to application for a construction permit. (b) Any dam or impoundment proposed for construction in unincorporated the county must have received all applicable federal and state environmental permits and must be compliant with all state and federal environmental regulations prior to application for a construction permit. (c) All dam design documentation submitted to the state safe dams program shall also be submitted to the county stormwater management department for review. (d) Minimum design requirements. (1) Any dam, as defined in the Safe Dams Act of 1978 (O.C.G.A. § 12-5-370 et seq.), proposed for construction in the unincorporated county shall meet all category I design and maintenance requirements as required by the Georgia Safe Dams Act of 1978 regardless of the state safe dams program classification. (2) Any dam or impoundment constructed to serve as access to a private residence shall have a top width of a minimum of 20 feet unobstructed width of access with an all-weather driving surface capable of supporting the imposed loads of fire apparatus and having a minimum vertical clearance of 13 feet six inches (reference SFPC 602.6). Nothing contained in these requirements shall be constructed to relieve the design engineer from his responsibility to provide a design that is accurate, adequate, and acceptable according to generally accepted engineering practices. (3) Any dam or impoundment constructed shall meet all requirements for land disturbance as referenced in article IX of this chapter, the county soil erosion, sedimentation and pollution control ordinance. (e) Submission of documents. The design documents submitted to the stormwater management department for review shall include: (1) Topographic drawings of the pond or lake site at a minimum scale of one inch equals 100 feet with two-foot contour intervals; (2) Plan, cross section and longitudinal drawings of the proposed dam showing the core, drains, cut-off trenches, spillways and the elevations of the one-, five-, ten-, 25-, 50-, and 100-year storm elevations; (3) Hydrologic and hydraulic design calculations including those required by the safe dams program for Category I and II dams; (4) Specifications for construction; (5) Detail drawings for appurtenances including principal and emergency spillways; (6) A dam-break analysis as required by the state safe dams program determining the extent and height of the flood wave including the location of any downstream structures and property and the impact of failure on such property and structures; (7) As-built drawings of the dam, sealed by the design engineer, shall be submitted to the stormwater management department prior to recording the final plat for the subdivision, if applicable. Certification of construction to specified compaction requirements shall also be provided, if applicable; (8) Access easement from the nearest street, that may or may not be a part of the development, for maintenance and emergency access purposes; and (9) Maintenance plan for the structure that shall describe the maintenance and the parties responsible for maintenance as required by the Georgia Safe Dams Program for Category I. (f) Emergency action plan. Provide an emergency action plan based on the dam-break analysis. The plan shall include, but is not limited to, a 24-hour emergency point-of-contact; procedures to follow upon detection of possible failure; inundation maps and a list of owner responsibilities including all emergency notifications. (g) Review. The stormwater management department shall have 30 calendar days to review the submitted documents and to either approve them or return them to the engineer with comments. ## History (Code 1992, § 8-305; Ord. No. 2012-03, § 1, 3-22-2012)