(a) With the exception of activities identified in subsection (c) of this section that are exempt from this article, any land disturbing activity in a groundwater recharge area district shall identify the groundwater recharge area district on any submittals to the county including, but not limited to, a site plan, preliminary plat, or a final plat, depending on the nature of the development. (b) The following information, in addition to any other requirements for site plans, preliminary plats, or final plats per the county development regulations, is required for all development within groundwater recharge areas: (1) Location and detailed design of any spill and leak collection systems designed for the purpose of containing accidentally released hazardous or toxic materials. (2) All development activities or site work conducted after site plan, preliminary plat, or final plat approval shall conform to specifications of said site plan, preliminary plat, or final plat. Significant changes to the site plan, preliminary plat, or final plat that alter the amount and velocity of stormwater runoff from the site, increase the amount of impervious surface within the development, alter the overall density of development, result in an increase in the amount of excavation, fill or removal of vegetation during construction or otherwise result in an alteration of the overall appearance of the development as proposed, can be amended only with the approval by the county. (c) The following activities are exempt from the requirement of this article: (1) Repairs to a facility that is part of a previously approved and permitted development. (2) Construction of minor structures, such as sheds or additions to single family residences.