Skip to content
Georgia Commons
Menu

Fayette County · Zoning Ordinance

Part II - COUNTY CODE / Part B - LAND DEVELOPMENT AND LAND USE / Chapter 104 - DEVELOPMENT REGULATIONS / Article XI - GROUNDWATER RECHARGE AREA PROTECTION ORDINANCE

Sec. 104-465. Groundwater protection standards.

About this text

  • As published by Municode, current through 2026-05-28
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) New waste disposal facilities must have synthetic lines and leachate collection systems.

(b) A SCS approved liner must be provided for new agricultural waste impoundments exceeding 50 acre-feet. As a minimum, the liner shall be constructed of compacted clay having a thickness of one-foot and a vertical hydraulic conductivity of less than 5 × 10-7 cm/sec or other criteria established by the natural resources conservation service.

(c) No land disposal of hazardous waste shall be permitted within any significant groundwater recharge area.

(d) For all significant groundwater recharge areas, the handling, storage and disposal of hazardous materials shall take place on an impermeable surface having spill and leak protection approved by the state department of natural resources, environmental protection division (EPD). New facilities that handle hazardous materials of the types listed in section 312 of the Resource Conservation and Recovery Act of 1976 (excluding underground storage tanks) and in the amounts of 10,000 pounds or more on any one day, shall perform their operations on impervious surfaces and in conformance with any applicable federal spill prevention requirements and local fire code requirements.

(e) For all significant groundwater recharge areas, new above ground chemical or petroleum storage tanks larger than 650 gallons must have secondary containment of 110 percent of tank volume or 110 percent of the largest tanks in a cluster of tanks.

(f) No construction may proceed on a building or mobile home to be served by a septic tank unless the county health department first approves the proposed septic tank installations as meeting the requirements of the state department of human resources manual for on-site sewage management systems (hereinafter referred to as DHR Manual) and subsection (g) of this section.

(g) Minimum lot size for new homes served by an individual septic tank/drain field system will be based on table MT-1 of the DHR Manual and the criteria for protection of groundwater recharge areas, A through D. Minimum lot or space size for mobile homes served by an individual septic tank/drain field system will be based on table MT-2 of the DHR manual and the criteria for protection of groundwater recharge areas, A through D. Section M, lot sizing of the DHR manual states in the criteria for protection of groundwater area, that if a local government requires a larger lot size than that required by (2A) of the DHR manual for homes or (2B) of the DHR manual for mobile homes, the larger lot size shall be used. Section M, lot sizing of the DHR manual is not printed herein but is on file in the county offices.

History

The history line the source prints at the end of the section.

(Code 1992, § 8-327; Ord. of 12-5-2001; Ord. No. 2012-04, § 1, 3-8-2012)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:fayette-county/zoning/104-465@2026-05-28-417f2507cd

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Fayette County Zoning Ordinance, Sec. 104-465. Groundwater protection standards | Georgia Commons