(a) Effective May 1, 2012, all subdivisions or site plans for proposed developments shall include an estimate of the average gross daily trips expected as a result of the project once fully developed and built-out. The number of trips shall be estimated using the ITE's trip generation rates. A traffic impact study shall be required for all developments estimated to generate a number of gross daily trips equal to or greater than threshold values established by the engineering department. The ADT of existing roads shall be determined by the engineering department and the data and means used to do so shall be shared with the project's owner upon request. (b) Traffic impact studies shall be prepared under the supervision of a professional engineer licensed in the state and with appropriate experience and knowledge of the subject matter. The final report shall he stamped and signed by the engineer. (c) The studies shall include, at a minimum, an assessment of existing and proposed traffic volumes and level of service for all existing roads and intersections within a "zone of influence" proposed by the design engineer and approved by the county's engineering department. Mitigation measures, to be agreed upon between the owner and the board of commissioners, shall be required for developments causing a significant impact to the county's transportation system, as determined by the engineering department. This may include, but is not limited to, a drop in level of service (LOS) of two letter grades (e.g., from LOS B to D) or any drop to a LOS of E or below that is not predicted without the proposed development, LOS values shall be established for both roadway segments and intersections. (d) Traffic impact studies shall provide options for mitigation that at least maintain the LOS that are predicted without the proposed subdivision or development in the year full build-out is expected. Concept-level cost estimates for the mitigation measures shall be included in the report. (e) Traffic impact studies, if applicable, shall be submittal with the preliminary plat for subdivisions or with the site plan for other types of developments. Additional guidance on the development of gross daily trips and traffic impact studies is available through the county's engineering department. (f) Rezoning applications. At the request of the technical review committee, a concept-level traffic impact study may be required by the applicant during the rezoning process. The purpose of the concept-level study is to ensure the applicant and county have: (1) A mutual understanding of the expected traffic impacts associated with the project; (2) Agreement on the probable need for mitigation measures; and (3) Similar expectations on the order-of-magnitude for the mitigation measures, if needed, development of a concept-level traffic impact study does not preclude the need for a full study at lime of subdivision or site plan submittal nor in any way limit the ultimate findings and conclusions of the full study.