--- title: Fayette County Zoning Ordinance, Sec. 104-52. Right-of-way collection: local-codes id: local-code:fayette-county/zoning/104-52 cite_as: Fayette County, Ga., Zoning Ordinance § 104-52 canonical_url: https://georgiacommons.org/code/local/fayette-county/zoning/104-52 md_url: https://georgiacommons.org/code/local/fayette-county/zoning/104-52.md text_url: https://georgiacommons.org/code/local/fayette-county/zoning/104-52/text source_url: https://library.municode.com/ga/fayette_county/codes/code_of_ordinances date: 2026-05-28 status: active jurisdiction: county:fayette jurisdiction_name: Fayette County county_fips: "13113" corpus_version: local-codes-fayette-county-a7a551bedadd publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/fayette-county/zoning/~part-ii/~part-b/~chapter-104/~article-iii.md previous: https://georgiacommons.org/code/local/fayette-county/zoning/104-51.md next: https://georgiacommons.org/code/local/fayette-county/zoning/104-53.md index: https://georgiacommons.org/code/local/fayette-county.md branch: zoning edition: As published by Municode, current through 2026-05-28 edition_date_kind: current_through source_publisher: Municode version_id: local-code:fayette-county/zoning/104-52@2026-05-28-d61a7bebb1 --- # Fayette County Zoning Ordinance, Sec. 104-52. Right-of-way > As published by Municode, current through 2026-05-28 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - COUNTY CODE / Part B - LAND DEVELOPMENT AND LAND USE / Chapter 104 - DEVELOPMENT REGULATIONS / Article III - STREET DESIGN STANDARDS AND SPECIFICATIONS (a) When permits/approvals are required. Approval from the county public works department is required prior to performing any construction work or nonroutine maintenance work within the county right-of-way. This includes but is not limited to the following: grading, landscaping, drainage work, and temporary access to land. Approval may be provided in the form of a driveway application permit, utility permit, construction plans, land disturbance permit (issued by stormwater management department) or written approval from the county engineer for unique circumstances that are not covered by the aforementioned. Work performed within county right-of-way without proper permits/approvals is subject to a stop work order and/or barricade, displacement or closure by public works. Any costs incurred to correct work perform unlawfully shall be reimbursed to the county by the adjacent property owner. (b) Right-of-way minimum widths. The following table serves a guide for planning, design and acquisition: Functional Classification Minimum Right-of-Way Major arterial Per GDOT Minor arterial 100 feet Collector 80 feet County local 60 feet Low-volume local 60 feet Internal local 60 feet The values in this subsection are recommended minimum widths. Additional right-of-way may be required based on a road's characteristics. In all cases the right-of-way shall extend at least 12 feet beyond the edge of pavement. (c) Nonresidential developments. Any nonresidential development requiring new or improved access to a public road and a site plan or land disturbance permit from the county shall donate right-of-way as needed, to provide for that access. (d) Development along gravel roads. Any development along a gravel road maintained by the county and requiring new or improved access and a site plan or land disturbance permit from the county shall donate right-of-way as needed, to provide for that access. ## History (Code 1992, § 8-50; Ord. No. 2012-06, § 1, 4-12-2012; Ord. No. 2024-04, §§ 1—7, 6-27-2024)