(a) General information. Placement of the base material and asphalt shall be inspected and approved by the engineering department as specified below. The owner of the project shall be responsible for requesting such inspections by the county. A minimum advance notice of 24 hours shall be provided when scheduling inspections. Placement of base and/or asphalt shall not be done until such inspections have been conducted. Unless noted otherwise, all tests and data, as required per this section, shall be provided by the owner at no cost to the county. All inspections shall be documented and include pertinent information such as date, time, inspector, weather, station numbers, results of inspection, required action, etc. (b) Subgrade. Kill areas shall be deconstructed in eight- to 12-inch lifts. Individual lifts shall be compacted using sheepsfoot rollers (or pneumatic tire rollers for cohesionless and low-cohesion soils) or similar equipment capable of obtaining the required compaction. The centerline profile shall conform to the established elevations within an acceptable tolerance of 0.1 foot. A surveyed as-built centerline profile shall be provided to the county for all collectors and arterials, and for any segment of a local road identified by the engineering department as having potential safety or drainage concerns. (1) Soil density tests shall be performed on roadway fills four feet in height or greater. Compaction tests shall be performed on every other lift (i.e., every 16 to 24 inches) at 100-foot intervals along the fill section. Compaction tests shall be performed to within 12 inches of the final grade of the subgrade. Fill areas shall be compacted to 95 percent maximum dry density per the standard proctor test (ASTM D698. AASHTO T99). The locations of the density tests are subject to county approval and additional test locations may be required if there are areas of questionable compaction. (2) The density testing shall be conducted by an independent third party selected by the owner and approved by the engineering department. If the subgrade compaction is less than the required percentage the owner shall remove, replace, and/or recompact the area in question, or use other means approved by the engineering department, until the density meets the required standards. Signed copies of all test results shall be submitted to the engineering department. (3) The compaction of the top 12 inches of subgrade shall be inspected by a proof roll inspection (see below). The proof roll inspection of the subgrade shall not be conducted until all applicable density test results have been submitted to, and approved by, the engineering department. (c) Lateral subdrains. Lateral subdrains shall be installed at locations shown on the approved construction plans. Unless approved otherwise, subdrains shall be placed at a minimum interval of every 500 feet for roads with a continuous grade of two percent or less and in all sag vertical curves and cul-de-sacs. The top of the stone surrounding the subdrain shall be at the interface of the subgrade and base. The subdrains shall extend from the road's centerline to the nearest drop inlet or ditch on either side of the road. In cul-de-sacs, the subdrain shall be designed to accommodate the location of the drop inlet and expected groundwater flow. Subdrains shall consist of a six-inch perforated plastic pipe placed near the bottom of a two feet wide by two feet deep ditch backfilled with clean No. 57 stone. Filter fabric shall be placed around the perimeter of the ditch prior to backfilling and the fabric folded over the top prior to placement of base material. A lateral subdrain detail is available from the engineering department to assist with design and installation. (d) Base. Base thickness shall be verified by field measurement and shall not be deficient in any area by more than one-half inch from the specifications on the approved construction drawings. Deficient areas shall be corrected by adding additional quantities of the same base material and rebuilt to the desired thickness. The owner, at his expense, shall prepare the holes for measurement. Measuring holes shall be dug every 500 feet, or less, to confirm the required base thickness. At least one additional measurement shall be taken for every measurement that is less than the minimum base thickness (excluding the one-half-inch tolerance). A representative from the county engineering or road department shall determine the measuring hole locations and confirm the depth of base. (e) Proof-rolls. Proof-roll inspections shall be conducted on the subgrade prior to placing base and on the base prior to pacing asphalt. The purpose of the proof-roll inspection is to ensure the subgrade and compacted based course have sufficient stability to support any and all types of heavy equipment used to build the road without pumping (i.e., vertical or horizontal displacement of the material due to a variety of factors, including too much water, not enough compaction, etc.). Proof-roll compaction inspections of the subgrade and base (two independent inspections) shall be by a loaded tandem-axle dump truck having a total weight of 56,000 pounds (28 tons). Any area not passing the proof-roll inspection shall be corrected by the owner at no cost to the county and then scheduled for reinspection. (f) Asphaltic and Portland cement concrete construction of roads and streets. The following table indicates the minimum material type and thicknesses for various types of roads within the county. At the discretion of the engineering department, the pavement design may be dictated by the anticipated surrounding land use rather than functional classification. Specifically, roads serving office-institutional and commercial uses shall be built to "collector" standards; and roads serving manufacturing or industrial uses shall be built to "arterial" standards: ASPHALTIC CONCRETE ROADS AND STREETS (minimum standards) Functional Classification Low-Volume Local, County Local and Internal Local Collector Arterial* Top course 1.5" 9.5 mm Type 2 1.5" 9.5 mm Type 2 1.5" 12.5 mm Binder 2.0" 19 mm 2.5" 19 mm 2.0" 19 mm Asphaltic base NA NA 3.0" 25 mm Base 6" crusher run or GAB on roadway 8" GAB on roadway 8" GAB on roadway 10" crusher run or GAB in cul-de-sacs 10" GAB in cul-desacs 10" GAB in cul-desacs *Note. The design for improvements to an arterial road or for the construction of a new arterial roadway shall include a pavement design that includes projected truck volumes. The pavement analysis shall follow current GDOT procedures and methods. Up to a ten percent under-design may be allowed if approved by the county engineer. In no case shall the pavement thickness be less than those shown in this table. The materials, methods and quality control used for installation of asphaltic concrete shall meet all applicable GDOT standards and specifications including, but not limited to, section 400—Hot Mix Asphaltic Concrete Construction. PORTLAND CEMENT CONCRETE ROADS AND STREETS (minimum standards) Functional Classification County Local and Internal Local Collector Arterials Pavement 6" concrete pavement 7" concrete pavement 8" concrete pavement Functional Classification County Local and Internal Local Collector Arterials Base 4" crusher run, GAB or other material approved by engineering 4" crusher run, GAB or other material approved by engineering 4" crusher run, GAB or other material approved by engineering The materials, methods and quality control used for installation of Portland cement concrete shall meet all applicable standards and specifications provided in the document titled section 439-Portland Cement Concrete pavement for Local Roads, Streets and Parking Lots, dated July 13, 2010. A copy of these standards and specifications are available through the county's engineering department. Pavement and base thickness shall be established in the concrete design and paving plans prepared for each project and alternate designs (i.e., from those specified above) may be used if approved by the engineering department. Exceptions to applicable GDOT standards and specifications, for either asphaltic concrete or Portland cement concrete, may be provided, upon request, by the engineering department exceptions shall only be valid if requested in writing and approved by the engineering department prior to start of paving operations. (g) Core samples. Pavement thickness shall be verified by core samples. The pavement thickness shall be considered unacceptable if it is deficient in any sample by more than one-fourth inch from the requirements on the approved construction drawings. Samples shall be taken every 500 feet from the center of a travel lane, alternating lanes between samples. A minimum of three samples shall be collected for every street (if less than 1,500 feet) with one of the three samples taken from the cul-de-sac, if present. Additional samples may also be required at pavement joint lines (typically road centerline) if field observations indicate a concern about thickness in these locations. At the discretion of the engineering department, additional samples may be required to isolate areas of concern around samples with asphalt thicknesses below the tolerance level. (1) The remedy to correct areas with insufficient pavement shall vary depending on the road type. For roads with no curb and gutter, the remedy shall include an overlay of an asphalt mix that matches the existing road surface and placed at a lift thickness within the accepted range for that mix type. Joints shall be milled to allow for a smooth transition between existing and new asphalt. The overlay shall extend to the nearest intersection if it is located within 100 feet of the problem area. (2) For roads with curb and gutter, the asphalt, base and subgrade shall be removed, as needed, to allow room for placement of base and asphalt in accordance with the county standards and approved construction plans. The finish elevation of the top course of asphalt shall be flush with the gutter. Joints shall be milled to allow for a smooth transition between existing and new asphalt. The overlay shall extend to the nearest intersection if it is located within 100 feet of the problem area.