It is hereby determined that: (1) Land development projects and other land-use conversions, and their associated changes to land-cover, permanently alter the hydrologic response of local watersheds and increase stormwater runoff rates and volumes, which in turn increase flooding, stream channel erosion, and sediment transport and deposition; (2) Land development projects and other land-use conversions also contribute to increased nonpoint source pollution and degradation of receiving water; (3) The impacts of post-construction stormwater runoff quantity and quality can adversely affect public safety, public and private property, drinking water supplies, recreation, fish and other aquatic life, property values and other uses of land and water; (4) These adverse impacts from new development and redevelopment can be controlled and minimized through the regulation of stormwater runoff quantity and quality by the use of both structural facilities as well as nonstructural measures; and (5) Localities in the state must comply with state and federal laws, regulations and permits that require impacts of post-construction stormwater runoff quality and nonpoint source pollution be addressed. Therefore, the county has established this set of stormwater management policies to provide reasonable guidance regulating post-construction stormwater runoff to control and minimize increases in stormwater runoff rates and volumes, postconstruction soil erosion and sedimentation, stream channel erosion, and nonpoint source pollution associated with post-construction stormwater runoff.