Skip to content
Georgia Commons
Menu

Fayette County · Zoning Ordinance

Part II - COUNTY CODE / Part B - LAND DEVELOPMENT AND LAND USE / Chapter 104 - DEVELOPMENT REGULATIONS / Article XIV - POST-CONSTRUCTION STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT

Sec. 104-559. General provisions

About this text

  • As published by Municode, current through 2026-05-28
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Purpose and intent. The purpose of this article is to protect, maintain and enhance the public health, safety, environment and general welfare by establishing minimum requirements and procedures to control the adverse effects of increased post-construction stormwater runoff and nonpoint-source pollution associated with new development and redevelopment. Additionally, Fayette County is required to comply with several state and federal laws, regulations and permits and the requirements of the Metropolitan North Georgia Water Planning District's regional water plan related to managing the water quantity, velocity, and quality of post-construction stormwater runoff. This article seeks to meet that purpose through the following objectives:

(1) Establish decision-making processes surrounding land development activities that protect and preserve the health of water resources;

(2) Require new development and redevelopment maintain the pre-development hydrologic response in their post-construction state as nearly as practicable in order to reduce flooding, streambank erosion, nonpoint source pollution, increases in stream temperatures, and preserve stream channel integrity and aquatic habitats;

(3) Establish minimum post-construction stormwater management standards and design criteria for the regulation and control of stormwater runoff quantity and quality;

(4) Establish design criteria for the construction and use of stormwater structural control facilities that can be used to meet the minimum post-construction stormwater management standards;

(5) Encourage nonstructural stormwater management and stormwater better site design practices, such as establishing natural conservation areas, to the maximum extent practicable;

(6) Establish provisions for the long-term responsibility and maintenance of stormwater management systems to ensure that they continue to function as designed, and are maintained, and pose no threat to public safety; and

(7) Establish administrative procedures for the submission, review, and approval of stormwater management applications, and inspection procedures of approved applications, for both construction and post-construction phases.

(b) Administration of article. The county environmental management department ("administrator") shall administer and implement the provisions of this article.

(c) Applicability criteria for stormwater management standards. This article shall be applicable to any new or redevelopment project within the unincorporated county that meets one or more of the following criteria:

(1) The project creates or adds 5,000 square feet or more of impervious cover; or

(2) The project disturbs one acre or more of land; or

(3) The project is part of a subdivision or other common plan of development, and the sum of all associated impervious surface area or land disturbing activities that are being developed as part of such subdivision or other common plan of development meets or exceeds the threshold in (a) and (b) above; or

(4) Any commercial or industrial new development or redevelopment, regardless of size, that is a hotspot land use as defined in this Article; or

(5) Linear transportation projects that exceed the threshold in (1) or (2) above.

(d) Exemptions from stormwater management standards. This article does not apply to the following activities:

(1) Land disturbing activity conducted by local, state, authority, or federal agencies, solely to respond to an emergency need to protect life, limb, or property or conduct emergency repairs;

(2) Land disturbing activity that consists solely of cutting a trench for utility work and related pavement replacement;

(3) Land disturbing activity conducted by local, state, authority, or federal agencies, whose sole purpose is to implement stormwater management or environmental restoration;

(4) Individual single-family or duplex residential lots that are not part of a larger common plan of development as long as downspout disconnects are provided per GSMM Section 4.4; This exemption, however, may be waived by the environmental management department if it is determined the project may have significant adverse impacts on downstream properties;

(5) Land disturbance for individual single-family or duplex residential lots that are part of a larger common plan of development (e.g., a subdivision or minor subdivision) but have no new roads (public or private) or other common structures associated with the subdivision or phased development downspout disconnects are provided per GSMM Section 4.4. This exemption, however, may be waived by the environmental management department if it is determined the project may have significant adverse impacts on downstream properties;

(6) Repairs to any stormwater management system deemed necessary by the administrator;

(7) Agricultural practices as described O.C.G.A. § 12-7-17(5) within areas zoned for these activities with the exception of buildings or permanent structures that exceed the threshold in section 104-559 (c)(1) or (2);

(8) Silvicultural land management activities as described O.C.G.A. § 12-7-17(6) within areas zoned for these activities with the exception of buildings or permanent structures that exceed the threshold in section 104-559(c)(1) or (2);

(9) Installations or modifications to existing structures solely to implement Americans with Disabilities Act (ADA) requirements, including but not limited to elevator shafts, handicapped access ramps and parking, and enlarged entrances or exits; and

(10) Linear transportation projects being constructed by Fayette County to the extent the administrator determines that the stormwater management standards may be infeasible to apply, all or in part, for any portion of the linear transportation project. For this exemption to apply, an infeasibility report that is compliant with the Fayette County linear feasibility program shall first be submitted to the administrator that contains adequate documentation to support the evaluation for the applicable portion(s) and any resulting infeasibility determination, if any, by the administrator.

(e) Compatibility with other regulations. This article is not intended to modify or repeal any other ordinance, rule, regulation, or other provision of law. The requirements of this article are in addition to the requirements of any other ordinance, rule, regulation or other provision of law, and where any provision of this article imposes restrictions different from those imposed by any other ordinance, rule, regulation or other provision of law, whichever provision is more restrictive or imposes higher protective standards for human health or the environment shall control.

(f) Effective date. The effective date of the ordinance from which this article is derived, known as the county's "Post-Development Stormwater Management for New Development and Redevelopment Ordinance," is August 1, 2005, and shall apply to all developments that have preliminary plats or site development plans initially received by the county zoning department on or after this date.

(g) Stormwater design manual. The environmental management department will utilize the policy, criteria and information including technical specifications and standards in the latest edition of the state stormwater management manual and any relevant local addenda. The manual may be updated and expanded periodically, based on improvements in science, engineering, monitoring and local maintenance experience. The environmental management department may publish an addendum to the state stormwater management manual to:

(1) Clarify discrepancies between the manual and any section of the county's development regulations;

(2) Specify requirements where options/alternatives are provided;

(3) Establish minimum design standards; or

(4) Further describe submittal requirements.

The criteria within the addendum shall be considered minimum design standards and, in the event of a conflict, supersede design standards set forth in the state stormwater management manual. Addendum shall be available from the environmental management department.

History

The history line the source prints at the end of the section.

(Ord. No. 2020-09, § 1, 12-10-2020)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:fayette-county/zoning/104-559@2026-05-28-4184321669

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Fayette County Zoning Ordinance, Sec. 104-559. General provisions | Georgia Commons