--- title: Fayette County Zoning Ordinance, Sec. 104-561. Stormwater management application submittals and procedures collection: local-codes id: local-code:fayette-county/zoning/104-561 cite_as: Fayette County, Ga., Zoning Ordinance § 104-561 canonical_url: https://georgiacommons.org/code/local/fayette-county/zoning/104-561 md_url: https://georgiacommons.org/code/local/fayette-county/zoning/104-561.md text_url: https://georgiacommons.org/code/local/fayette-county/zoning/104-561/text source_url: https://library.municode.com/ga/fayette_county/codes/code_of_ordinances date: 2026-05-28 status: active jurisdiction: county:fayette jurisdiction_name: Fayette County county_fips: "13113" corpus_version: local-codes-fayette-county-a7a551bedadd publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/fayette-county/zoning/~part-ii/~part-b/~chapter-104/~article-xiv.md previous: https://georgiacommons.org/code/local/fayette-county/zoning/104-560.md next: https://georgiacommons.org/code/local/fayette-county/zoning/104-562.md index: https://georgiacommons.org/code/local/fayette-county.md branch: zoning edition: As published by Municode, current through 2026-05-28 edition_date_kind: current_through source_publisher: Municode version_id: local-code:fayette-county/zoning/104-561@2026-05-28-37e2d5bffc --- # Fayette County Zoning Ordinance, Sec. 104-561. Stormwater management application submittals and procedures > As published by Municode, current through 2026-05-28 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - COUNTY CODE / Part B - LAND DEVELOPMENT AND LAND USE / Chapter 104 - DEVELOPMENT REGULATIONS / Article XIV - POST-CONSTRUCTION STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT (a) Unless specifically exempted by this article, any owner or developer proposing a land activity shall submit the following items to the environmental management department: (1) Stormwater management plan; (2) Operations and maintenance plan; (3) Inspection and maintenance agreement; (4) Stormwater assessment area; (5) Application review fees; (6) Application procedure; and (7) Other submittals. Each of the submittals in this subsection shall be in accordance with the criteria specified in the following subsections. (b) Stormwater management plan. The stormwater management plan shall detail how post-construction stormwater runoff will be controlled or managed and how the proposed project will meet the requirements of this article, including the performance criteria set forth in section 104-560. This plan shall be submitted under the stamp and signature of a professional engineer licensed in the state. In addition, the professional engineer shall provide written certification that the plan meets the design criteria established in this article and the stormwater design manual. Any revisions to the stormwater management plan, including, but not limited to, installation of new stormwater structures, additions to approved stormwater structures, or modifications of existing structures, shall be submitted with the stamp and seal of a professional engineer licensed in the state and receive written approval from the environmental management department prior to implementation. The stormwater management plan shall include, at a minimum, the following information and be presented in the order set forth as follows: (1) Common address and description of site. The description of the site shall include the metes and bounds of the property, via a survey or written legal description, and identification of all adjacent property owners. (2) Vicinity map. (3) Natural resource inventory. (4) Stormwater concept plan. (5) Existing conditions hydrologic analysis. The existing condition hydrologic analysis for stormwater runoff rates, volumes, and velocities shall include: a. A topographic map of existing site conditions with each drainage basin boundary indicated. Drainage divides and downstream receiving waters shall be clearly delineated on the topographic map; b. Acreage, soil types and land cover of areas for each subbasin affected by the project; c. All perennial and intermittent streams, jurisdictional wetlands, and other surface water features; d. All existing stormwater management systems; e. Direction of flow and exits from the site; f. Analysis of runoff provided by off-site areas upstream of the project site; g. Methodologies, assumptions, site parameters and supporting design calculations used in analyzing the existing conditions site hydrology; h. Cumulative impervious cover since adoption of original ordinance; and i. Construction sequencing plan. For redevelopment sites, pre-development conditions for the portion of the site undergoing land development activities shall be based on field conditions prior to any structural or impervious improvements. Predevelopment conditions for the portion of the site outside the land development activities shall be based on the conditions present when the stormwater management plan is submitted to the county. (6) Post-development hydrologic analysis. The post-development hydrologic analysis for stormwater runoff rates, volumes, and velocities shall include: a. A topographic map of developed site conditions (i.e., proposed contours) with the post-development drainage basin boundaries indicated. Drainage divides and downstream receiving waters shall be clearly delineated on the topographic map; b. Total area of post-development impervious surfaces and other land cover areas for each subbasin affected by the project; c. Calculations for determining the runoff volumes that need to be addressed for each subbasin for the development project to meet the post-development stormwater management performance criteria in section 104-560; d. Location and boundaries of proposed natural feature protection and conservation areas; e. Documentation and calculations for any applicable site design credits that are being used; and f. Methodologies, assumptions, site parameters and supporting design calculations used in analyzing the existing conditions site hydrology. If the land development activity on a redevelopment site constitutes more than 50 percent of the site, then the stormwater runoff performance criteria in section 104-560 must be met for the entire site. (7) Stormwater management system. The description, scaled drawings and design calculations for the proposed post-construction stormwater management system, shall include the following: a. A map and drawing of the stormwater management facilities, including the location of nonstructural site design features and the placement of existing and proposed stormwater structural controls. Design water surface elevations, storage volumes available from zero to maximum head, location of inlet and outlets, location of bypass and discharge systems, and all orifice/restrictor sizes for all structural controls shall be indicated; b. Cross section and profile drawings and design details for each of the stormwater structural controls in the system, including supporting calculations to show that the system is designed according to the applicable design criteria; c. A hydrologic and hydraulic analysis of the stormwater management system for all applicable storms events (including stage-storage or outlet rating curves, and inflow and outflow hydrographs); d. Documentation and supporting calculations to show that the stormwater management system adequately meets the post-construction stormwater management performance criteria in section 104-560; e. Drawings, design calculations, elevations and hydraulic grade lines for all existing and proposed stormwater conveyances including stormwater drains, pipes, culverts, catchbasins, channels, swales, ditches and areas of overland flow; and f. Where applicable, a narrative describing how the stormwater management system corresponds with any watershed protection plans. (8) Downstream analysis. (9) Erosion and sedimentation control plan. (10) Determination of infeasibility (if applicable). (c) Operations and maintenance plan. Property owners are responsible for performing operation and maintenance activities for stormwater management facilities and practices located on their property; see section 104-563, for additional information. The applicant shall provide a project-specific operations and maintenance plan that includes detailed descriptions of required operations and maintenance procedures for the project's stormwater management facilities and practices to ensure their continued function as designed and constructed. The plan shall identify the parts or components of each stormwater management facility or practice that needs to be regularly or periodically inspected and maintained, and the equipment and skills or training necessary for this work. The plan shall include a detailed inspection and maintenance schedule, a list of all maintenance tasks, and identify the responsible parties for all maintenance, funding access and safety issues. Provisions for the periodic review and evaluation of the effectiveness of the maintenance program and the need for revisions or additional maintenance procedures shall also be included in the plan. Checklists shall be provided, as appropriate. Any revisions to the operations and maintenance plan shall be submitted with the stamp and seal of a professional engineering licensed in the state and receive written approval from the county environmental management department. (d) Inspection and maintenance agreements. The applicant or owner of the land involved in a land development project requiring a stormwater management facility or practice hereunder and for which the county requires ongoing maintenance must execute a stormwater management inspection and maintenance agreement, as defined in this article (appendix A) and/or a conservation easement, if applicable, that shall be binding on all subsequent owners of the site or any portion thereof. (1) The stormwater management inspection and maintenance agreement shall require approval by the environmental management department prior to final plat approval or issuance of a certificate of occupancy. A covenant running with the land will describe said agreement and the obligation of all present and future holders of any interest in the development or any portion thereof. Said covenant shall be recorded on the deed of every parcel of property and/or lot that is derived in any way from the land development activity. Thereafter, each deed shall be recorded in the county deed records by the applicant. (2) The stormwater management inspection and maintenance agreement shall identify by name and official title, if applicable, the persons bound by said agreement to cause said inspection and maintenance. Responsibility for the operation and maintenance of the stormwater management facility or practice shall remain that of the party which executed the stormwater management inspection and maintenance agreement unless and until such time as the duties hereunder are properly assumed by a homeowners' association which is created as specified in this article. Evidence of the assumption of such duties shall be in a writing executed by the party assigning said duties and the homeowners' association and agreed to by the county. (3) The duties created under the inspection and maintenance agreement shall transfer to each and every subsequent owner/applicant, or homeowners' association (where one is established and duties are assigned thereto, in accordance with this article), or similar holders of interest in the development or any portion thereof. Upon transfer, each owner/applicant, homeowners' association, or similar interest holder shall cause the deed of transfer to be marked upon its face with notice of obligations of the stormwater management inspection and maintenance agreement through use of a restrictive covenant, as previously described. Each successor in title shall be bound by the stormwater management inspection and maintenance agreement to all the duties of his predecessor there under. The stormwater management inspection and maintenance agreement shall incorporate by reference the project's operation and maintenance plan and account for all the work requirements specified in the plan. (4) In addition to enforcing the terms of the inspection and maintenance agreement, the environmental management department may also enforce all of the provisions for ongoing inspection and maintenance in section 104-563. (e) Residential subdivisions. Prior to final plat approval, the developer of a subdivision, which is subject to the provisions of this article, shall create a homeowners' association for the residential subdivisions for which the developer is requesting approval. All property owners within the subdivision shall be members of the homeowners' association. The homeowners' association shall be the legal entity to which all correspondence and notice, required under or related to this article is given by the county and from which the county will accept the same. (f) Stormwater assessment area. Prior to final plat approval, the developer of any common development subject to the provisions of this article shall establish a stormwater assessment area that shall thereafter encompass the development, each subdivision thereof, and any other property that is alleged to be covered/served by the stormwater management plan. The stormwater assessment area shall be established through covenants running with each parcel of land in the assessment area, as evidenced through a recording in county deed records. The recording shall cause notice of the existence of the stormwater assessment area to transfer front one interest holder to the next with each sale of any parcel in the stormwater assessment area, until the stormwater management plan is replaced with a new plan or said plan is found to be inapplicable by the environmental management department. Property owners within a stormwater assessment area may be billed annually for the cost to the county to perform maintenance and repair activities on privately owned stormwater management systems. The rate for stormwater assessment areas shall be determined based on the total cost incurred by the county in repairing and maintaining these systems divided by the number of nonexempt parcels that exist in the applicable stormwater assessment area. (g) For redevelopment and to the extent existing stormwater management structures are being used to meet stormwater management standards the following must also be included in the stormwater management plan for existing stormwater management structures: (1) As-built drawings; (2) Hydrology reports; (3) Current inspection of existing stormwater management structures with deficiencies noted; and (4) BMP landscaping plans. (h) Other submittals. (1) BMP landscaping plan. A detailed landscaping and vegetation plan describing the woody and herbaceous vegetation that will be used within and adjacent to any stormwater management system. This plan may be included with the land development landscaping plan required in article V of this chapter. The landscaping plan shall include: a. The arrangement of planted areas around the stormwater management systems; b. Information necessary to construct the landscaping elements shown on the plan drawings; c. Descriptions and standards for the methods, materials and vegetation that are to be used in the landscaping; d. Density of plantings; e. Descriptions of the stabilization and management techniques used to establish vegetation; and f. A description of who will be responsible for ongoing maintenance of vegetation for the stormwater management facility system and what practices will be employed to ensure that adequate vegetative cover is preserved. (2) Maintenance bonds. The applicant shall provide the appropriate maintenance bond as specified in article XV of this chapter. (3) As-builts. Upon completion of the construction activities, the applicant shall submit as-built plans for all stormwater management systems. The plan must show the final design specifications for all stormwater management systems must be certified by a professional engineer registered in the state. The as-built plan shall also include stage/storage data for all detention or retention structures. These data shall be provided and certified by a registered land surveyor. A final inspection by the environmental management department is required before the release of any performance securities can occur. (4) Post stormwater pipe inspections. All pipes within the county right-of-way will require an inspection consistent with Georgia Department of Transpiration (GDOT) GDT 136 and GDOT Specification Section 550. This inspection shall be conducted after utilities are installed, unless a variance is granted by the planning commission to not install the utilities. (5) Evidence of acquisition of applicable local and nonlocal permits. The applicant shall certify and provide documentation to the county environmental management department that all other applicable environmental permits have been acquired for the site prior to approval of the stormwater management plan. (i) Application review fees. The fee for review of any stormwater management application shall be based on the fee structure established by the county board of commissioners and shall be made prior to the issuance of any building permit for the development. (j) Application procedure. (1) Two copies of the stormwater management plan, the inspection and maintenance agreement, and all applicable documents (conservation easements, etc.) shall be submitted to the environmental management department with the project's construction drawings or commercial site plan. (2) The environmental management department shall inform the applicant whether the submittals are approved or disapproved. (3) If the deliverables required by this article are not approved, the environmental management department shall notify the applicant of such fact in writing. The applicant may then revise any item not meeting the requirements hereof and resubmit the same, in which event this subsection and subsection (i)(2) of this section shall apply to such resubmittal. (4) A land-disturbance permit for a project shall not be issued by the environmental management department until all applicable sections of this article are satisfied and approved by the environmental management department. (5) Developments requiring a final plat. All remaining submittal requirements (e.g., creation of a stormwater assessment area) shall be submitted to the environmental management department with or prior to the project's final plat. The environmental management department shall inform the applicant whether the submittals are approved or disapproved. If any deliverable submittal is not approved, the environmental management department shall notify the applicant of such fact in writing. The applicant may then revise any item not meeting the requirements hereof and resubmit the same, in which event this subsection shall apply to such resubmittal. The final plat shall not be approved by the environmental management department until all submittal requirements are satisfied. (6) Developments not requiring a final plat. All remaining submittal requirements shall be submitted to the environmental management department prior to issuance of a certificate of occupancy by the county permits and inspections department. The environmental management department shall inform the applicant whether the submittals are approved or disapproved. If any deliverable is not approved, the environmental management department shall notify the applicant of such fact in writing. The applicant may then revise any item not meeting the requirements hereof and resubmit the same, in which event this subparagraph shall apply to such resubmittal. The county permits and inspections department shall not issue the certificate of occupancy until all submittal requirements are satisfied. (k) Notwithstanding the issuance of a land-disturbance permit. In conducting the land development project, the applicant or other responsible person shall be subject to the following requirements: (1) The applicant shall comply with all applicable requirements of the approved plan and this article and shall certify that all land clearing, construction, land development and drainage will be done according to the approved plan; (2) The land development project shall be conducted only within the area specified in the approved plan; (3) The environmental management department shall be allowed to conduct periodic inspections of the project using the approved stormwater management plan and the construction sequencing plan for establishing compliance; (4) No changes may be made to an approved plan without review and written approval by the environmental management department; and (5) Upon completion of the project, the applicant or other responsible person shall submit the engineers report and certification and as-built reports as required by this section. ## History (Ord. No. 2020-09, § 1, 12-10-2020)