--- title: Fayette County Zoning Ordinance, Sec. 104-562. Construction inspections of post-construction stormwater management system collection: local-codes id: local-code:fayette-county/zoning/104-562 cite_as: Fayette County, Ga., Zoning Ordinance § 104-562 canonical_url: https://georgiacommons.org/code/local/fayette-county/zoning/104-562 md_url: https://georgiacommons.org/code/local/fayette-county/zoning/104-562.md text_url: https://georgiacommons.org/code/local/fayette-county/zoning/104-562/text source_url: https://library.municode.com/ga/fayette_county/codes/code_of_ordinances date: 2026-05-28 status: active jurisdiction: county:fayette jurisdiction_name: Fayette County county_fips: "13113" corpus_version: local-codes-fayette-county-a7a551bedadd publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/fayette-county/zoning/~part-ii/~part-b/~chapter-104/~article-xiv.md previous: https://georgiacommons.org/code/local/fayette-county/zoning/104-561.md next: https://georgiacommons.org/code/local/fayette-county/zoning/104-563.md index: https://georgiacommons.org/code/local/fayette-county.md branch: zoning edition: As published by Municode, current through 2026-05-28 edition_date_kind: current_through source_publisher: Municode version_id: local-code:fayette-county/zoning/104-562@2026-05-28-284aa7ea55 --- # Fayette County Zoning Ordinance, Sec. 104-562. Construction inspections of post-construction stormwater management system > As published by Municode, current through 2026-05-28 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - COUNTY CODE / Part B - LAND DEVELOPMENT AND LAND USE / Chapter 104 - DEVELOPMENT REGULATIONS / Article XIV - POST-CONSTRUCTION STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT (a) Inspections to ensure plan compliance during construction; storm sewer installation report. A third-party pipe installation inspection report shall be required for all pipes placed in the ground and shall include the following information: (1) Description of subgrade and bedding used in installation; (2) Pipe material certifications; (3) Description of backfill methods used; (4) A summary of all field inspections, including the name and affiliation of the inspector, date and time of visits, and summary of activities observed; and (5) Certification from a registered professional engineer that the pipe was installed in accordance to the approved construction plans and any applicable Georgia DOT, AASHTO or American Concrete Pipe Association Standards. (b) Periodic inspections. Periodic inspections of the stormwater management system construction shall be conducted and certified by a professional engineer registered in the state. Construction inspections shall utilize the approved stormwater management plan for establishing compliance. The minimum number and schedule of inspections shall be based on the proposed design and established by the environmental management department during the project's preconstruction meeting. All inspections shall be documented with written reports that contain the following information: (1) The name of the inspector, the date and location of the inspection, and a summary of the activities observed; (2) A determination if the construction activities are in compliance with the approved stormwater management plan; (3) Variations from the approved construction specifications; and (4) Any other variations or violations of the conditions of the approved stormwater management plan. If any violations are found, the applicant shall be notified in writing of the nature of the violation and the required corrective actions. ## History (Ord. No. 2020-09, § 1, 12-10-2020)