(a) Determination of floodplain boundaries. (1) Studied "A" zones, as identified in the FIS shall be used to establish base flood elevations whenever available. (2) For all streams with a drainage area of 100 acres or greater, the futureconditions flood elevations shall be provided by the environmental management department. If future-conditions elevation data is not available from the environmental management department, then it shall be determined by a licensed professional engineer using a method approved by FEMA and the environmental management department. (3) For streams or other drainage basins with drainage areas less than 100 acres, areas of special flood hazard shall be determined by a licensed professional engineer using a method approved by the environmental management department, as required by the environmental management director. (4) The area of special flood hazard shall be delineated for all manmade flood hazards (e.g., yard drains, stormwater management structures, inlets to storm sewer systems, dams or impoundments, etc.) by a licensed professional engineer. (b) Determination of floodway boundaries. The width of a floodway shall be determined from the FIS, the Fayette County 2013 Future-conditions Flood Study or other FEMA-approved flood study. For all streams with a drainage area of 100 acres or greater, the regulatory floodway shall be provided by the environmental management department. If floodway data is not available from the environmental management department, then it shall be determined by a licensed professional engineer using a method approved by FEMA and the environmental management department. (c) General standards. (1) No development shall be allowed within an area of special flood hazard or an area of future-conditions flood hazard that could result in any of the following: a. Raising the base flood elevation or future-conditions flood elevation equal to or more than one 0.01 foot; b. Reducing the base-flood or future-conditions flood storage capacity; c. Changing the flow characteristics as to the depth and velocity of the waters of the base flood or future-conditions flood as they pass both the upstream and the downstream boundaries of the development area; or d. Creating hazardous or erosion-producing velocities, or resulting in excessive sedimentation. (2) Any development within an area of special flood hazard or an area of future-conditions flood hazard allowed under subsection (c)(1) of this section shall also meet the following conditions: a. Acceptable means of providing required compensation include lowering of natural ground elevations within the floodplain, or lowering of adjoining land areas to create additional floodplain storage. In no case shall any required compensation be provided via bottom storage or by excavating below the elevation of the natural (pre-development) stream channel unless such excavation results from the widening or relocation of the stream channel; b. Cut areas shall be stabilized and graded to a slope of no less than two percent; c. Effective transitions shall be provided such that flow velocities occurring on both upstream and downstream properties are not increased or decreased; d. Verification of no-rise conditions, [0.01 foot or less], flood storage volumes, and flow characteristics shall he provided via a step-backwater analysis meeting the requirements of section 104-88(e); e. Public utilities and facilities, such as water, sanitary sewer, gas, and electrical systems, shall be located and constructed to minimize or eliminate infiltration or contamination from floodwaters; and f. Any significant physical changes to the base flood floodplain shall he submitted as a conditional letter of map revision (CLOMR) or conditional letter of map amendment (CLOMA), whichever is applicable The CLOMR submittal shall be subject to approval by the Environmental Management Department using the community concurrence forms before forwarding the submittal package to FEMA for final approval The responsibility for forwarding the CLOMR to FEMA and for obtaining the CLOMR approval shall be the responsibility of the applicant. Within six months of the completion of development, the applicant shall submit as-built surveys and plans for a final letter of map revision (LOMR).