--- title: Fayette County Zoning Ordinance, Sec. 110-105. Standards for telecommunications antennas and towers collection: local-codes id: local-code:fayette-county/zoning/110-105 cite_as: Fayette County, Ga., Zoning Ordinance § 110-105 canonical_url: https://georgiacommons.org/code/local/fayette-county/zoning/110-105 md_url: https://georgiacommons.org/code/local/fayette-county/zoning/110-105.md text_url: https://georgiacommons.org/code/local/fayette-county/zoning/110-105/text source_url: https://library.municode.com/ga/fayette_county/codes/code_of_ordinances date: 2026-05-28 status: active jurisdiction: county:fayette jurisdiction_name: Fayette County county_fips: "13113" corpus_version: local-codes-fayette-county-a7a551bedadd publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/fayette-county/zoning/~part-ii/~part-b/~chapter-110/~article-iii.md previous: https://georgiacommons.org/code/local/fayette-county/zoning/110-104.md next: https://georgiacommons.org/code/local/fayette-county/zoning/110-106.md index: https://georgiacommons.org/code/local/fayette-county.md branch: zoning edition: As published by Municode, current through 2026-05-28 edition_date_kind: current_through source_publisher: Municode version_id: local-code:fayette-county/zoning/110-105@2026-05-28-0bbd88ed07 --- # Fayette County Zoning Ordinance, Sec. 110-105. Standards for telecommunications antennas and towers > As published by Municode, current through 2026-05-28 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - COUNTY CODE / Part B - LAND DEVELOPMENT AND LAND USE / Chapter 110 - ZONING / Article III - GENERAL PROVISIONS (a) Purpose and intent. The purpose of this chapter is to establish minimum development standards for the regulation of commercial telecommunications transmission towers, including, but not limited to: cellular and personal communications systems (PCS) towers, broadcasting towers, two-way radio towers, fixed-point microwave dishes, commercial satellites and receiving dishes, and related equipment cabinets and/or buildings. The intent of this chapter is: (1) To implement the provisions of the Telecommunications Act of 1996, on a local level; (2) To control placement of towers and antennas in a way that minimizes the adverse visual impact to nearby properties by locating towers and antennas in nonresidential areas or in areas where the adverse impact on the community is minimal; and (3) To advocate the shared use of existing and planned tower sites through co-location, thereby discouraging the proliferation of towers throughout the county. (b) Authority. Only the board of commissioners has the authority to reduce or waive the requirements under this section through the public hearing procedure. (c) Applicability. (1) District height limitations. Height limits specified for each zoning district shall not apply to towers and antennas. The requirements set forth herein shall govern the height of towers and antennas. (2) Governmentally owned property. These requirements shall not apply to any governmentally owned property, including: properties owned by the board of commissioners, board of education, or a municipality, as well as, the state or federal government, that are used for the location of any tower facility. (3) Amateur radio antennas. This chapter shall not govern any amateur radio tower, or the installation of any antenna, that is less than 70 feet in height and is owned and operated by a federally licensed amateur radio station operator. (4) Pre-existing towers and antennas. a. Any tower or antenna which existed prior to May 24, 2012, that does not comply with the requirements herein shall be deemed legally nonconforming. Any enlargement of a pre-existing tower or tower facility, shall meet the requirements herein. Co-location of an antenna which does not increase the height of the tower or placement of additional equipment cabinets or buildings within the existing tower facility shall be allowed under the provisions of site plan requirements. b. Replacement of a pre-existing legally nonconforming tower structure is permitted provided that all of the following apply: 1. The replacement tower is constructed within 25 feet of the existing tower and is not greater in height than the existing tower; 2. The lower being replaced is removed from site within 90 calendar days from the issuance of the certificate of occupancy for the replacement tower; 3. Additional co-location opportunities on the new tower are made available with the minimum users required based on tower height; and 4. A site plan indicating the location of the replacement tower shall be required. (d) General requirements. (1) Towers and tower facilities shall be on a lot which meets the minimum requirements for the zoning district in which it is located. Towers and tower facilities may be located on a lot containing another use. Towers and tower facilities may occupy a leased area being a portion of the lot. (2) Internal setbacks for towers, tower facilities, and anchors shall be measured to the boundaries of the lot, not the boundaries of the leased area. Setbacks for towers shall be measured from the base of the tower. a. All towers shall be set back from all adjoining properties zoned residential or A-R a distance equal to the height of the tower (excluding any lightning rod) plus ten feet. b. All towers shall be set back from all adjoining properties zoned nonresidential a distance of 100 feet. c. All towers shall be set back from the street right-of-way (existing or required, whichever is greater) a distance equal to the height of the tower (excluding any lightning rod). Street right-of-way is based on the classification of the street (see chapter 104, development regulations). d. Any tower facility and anchors for guyed towers shall comply with the minimum required setbacks and/or buffers of the applicable zoning district. (3) Towers located on the same lot as a private school or day care center shall be set back a distance equal to the height of the tower (excluding any lightning rod) from all facilities, excluding parking areas. This provision shall not apply to an alternative tower structure which is allowed in conjunction with a private school conditional use. (4) All towers, excluding alternative tower structures, shall be structurally designed to accommodate the following minimum numbers of carriers based on height of the tower: a. Up to 70 feet: one carrier; b. Greater than 70 up to 120 feet: two carriers; c. Greater than 120 feet up to 150 feet; three carriers; d. Greater than 150 feet up to 180 feet: four carriers; e. Greater than 180 feet up to 250 feet: five carriers; and f. Greater than 250 feet: six carriers. (5) All tower facilities, excluding tower facilities associated with alternative tower structures, shall be enclosed by a steel chain-link fence not less than eight feet in height, with slat inserts for screening. Access to the telecommunication tower shall be through a locking gate. In addition, a minimum of three strands of barbed wire shall be used along the top of the fence to prevent unauthorized access to the tower. (6) A landscaped strip ten feet in width surrounding the perimeter of the tower facility shall be required. Landscaping shall be staggered double rows of evergreen trees a minimum of six feet in height when planted and spaced every ten feet on center. Landscaping shall be installed on the outside of the required security fence. Existing mature tree growth and natural land forms on the site shall be preserved to the maximum extent possible. In some cases, such as towers sited on large wooded lots, the zoning administrator may determine that natural growth around the property perimeter may be sufficient in lieu of the required landscaping. If existing vegetation is to remain and requested to count toward the landscaping requirements, all such information, including location, size, and type of vegetation shall be indicated on the site/landscape plan. These requirements shall not apply to a tower facility associated with an alternative tower structure. (7) Maximum height for all towers and antennas is 500 feet. Tower height shall be measured from the natural grade of the ground at the location of the tower to the highest point of the tower, including any antenna, but excluding any lightning rod. If minimal grading (elevation of one to two feet above natural grade) is required to level the ground for the tower base, tower height shall be measured from the finished grade approved by the county engineer. (8) No signage, other than required safety signage, shall be placed on a tower structure or antenna. (9) Aesthetics and lighting requirements. The following compatibility standards shall govern the aesthetics and lighting of any tower facility, including the installation of antennas on towers: a. Towers shall either maintain a galvanized steel finish or, subject to any applicable standards of the FAA, be painted a neutral color, so as to reduce visual obtrusiveness. b. If an antenna is installed on a structure other than a tower, the antenna and equipment cabinets shall be architecturally compatible with, the color and texture of the supporting structure. Roof-mounted equipment cabinets shall be screened so as to make the equipment visually unobtrusive. c. Towers shall not be artificially lighted, unless required by the FAA or other applicable authority. (10) Removal of abandoned antennas and towers. Prior to the abandonment of any tower or antenna, a copy of the notice of intent to abandon required by the FCC shall also be submitted to the county planning and zoning department. Any antenna or tower, including pre-existing towers and antennas, that is not in use for a continuous period of 12 months shall be considered abandoned, and the owner of such antenna or tower shall remove same within 90 days of receipt of notice from the governing authority notifying the owner of such abandonment. If there are two or more users of a single tower, then this provision shall not become effective until all users cease using the tower. (11) Performance bond required. Prior to the issuance of a certificate of occupancy for a new tower structure, every applicant shall be required to deposit a performance bond with the county. The amount of the bond shall be equal to ten percent of the total construction cost or a minimum of $5,000.00, whichever is greater. Such bond shall be required upon compliance with all aspects of this section and shall be applicable to any assignee and owner of any permit granted hereunder, or any employee, contractor, subcontractor, or other party performing services in connection with any certificate of zoning compliance issued by the planning and zoning department. The required performance bond shall be released only upon demolition of the tower and restoration of the site to the pre-development conditions. The approved format of the bond is available in the planning and zoning department. (e) Supplemental requirements. In addition to the general requirements above, the following supplemental requirements shall apply as specified below: (1) Highway corridor. Locating towers along the following highway corridors is permitted as an overlay zone provided all the following requirements are met: a. The state and county highways included within the highway corridor are SR 54, SR 85, SR 92, SR 74, SR 314, SR 279, SR 138, and 85 Connector. b. The highway corridor tower overlay zone permits towers in any zoning district when located within 1,000 feet of the right-of-way on either side of the aforementioned roads in unincorporated areas of the county. c. Towers in excess of 250 feet in height in the highway corridor shall require public hearings before the planning commission and board of commissioners. d. All new towers, excluding alternative tower structures, located within the highway corridor that are 70 feet or greater in height shall not be located within one statute mile from any existing or planned towers (within any local government jurisdiction) that are 70 feet or greater in height. This minimum distance requirement shall not apply from existing governmentally owned towers where co-location is not permitted or from alternative tower structures. (2) Outside of the highway corridor. a. Outside of the highway corridor, a tower may be located only in the following zoning districts: 1. Manufacturing and heavy industrial district (M-2); 2. Light Industrial District (M-1); 3. Highway Commercial District (C-H); 4. Community Commercial District (C-C); 5. Planned Unit Development (PUD) excluding PUD-PRD; 6. Agricultural-Residential (A-R); and 7. R-70 Single-Family Residential District. b. Towers in excess of 180 feet in height outside of the highway corridor shall require public hearings before the planning commission and board of commissioners. c. All new towers, excluding alternative tower structures, located outside of the highway corridor that are 70 feet or greater in height shall not be located within 11 /2 statute miles from any existing or planned towers (within any local government jurisdiction) that are 70 feet or greater in height. This minimum distance requirement shall not apply from existing government-owned towers where co-location is not permitted or from alternative tower structures. (3) Alternative tower structures. a. The purpose of an alternative tower structure is to diminish, camouflage, or conceal the appearance of towers and antennas to reduce the visual impact on surrounding properties and streets. Depending on the nature of the site, the proposed alternative tower structure shall be appropriate and in character with its surroundings. For example, the use of a monopine is more fitting on a site with stands of mature trees; whereas, the use of a flag pole or light pole alternative tower structure is more suitable for the developed portion of a site. b. Alternative tower structures shall comply with the general requirements herein with the exception of security fencing requirements, landscape requirements, and tower separation requirements of both the highway corridor and outside of the highway corridor. Alternative tower structures shall be allowed in the highway corridor, outside of the highway corridor in the zoning districts listed herein, and in conjunction with the following existing conditional uses: 1. Church or other place of worship; 2. Developed residential recreational/amenity areas; 3. Private school; and 4. Telephone, electric, or gas sub-station or other public utility facilities. c. Alternative tower structures, in conjunction with the above listed conditional uses, shall meet the setbacks established in the general requirements or the conditional use setbacks, whichever is greater. d. An alternative tower in excess of 120 feet in height shall require public hearings before the planning commission and board of commissioners. e. A maximum of one alternative tower structure shall be allowed per lot. f. The alternative tower structure shall match the visual simulation depiction and engineering detail and specification drawings from the manufacturer/supplier of the alternative tower structure specifically proposed for the site. g. Design review and approval process: alternative tower structures shall go through a design review and approval process before the planning commission. The purpose of this design review and approval process is to determine that the alternative tower structure type is appropriate for the site and surrounding area and set requirements for the alternative tower structure type, placement on the site, equipment structures, fencing and landscaping. The design review and approval process application shall include the following: 1. An analysis of the nature and character of the site and how the alternative tower structure is appropriate in context to the site and the view from surrounding properties and streets; 2. A visual simulation consisting of color photographs of the proposed site with the existing view and with a depiction of the proposed tower, from a minimum of four distinct quadrants (generally north, cast, south, and west), to demonstrate the visual impact on surrounding properties and streets; and 3. Engineering detail and specification drawings from the manufacturer/ supplier of the alternative tower structure specifically proposed for the site which shall indicate all applicable requirements herein. h. Monopine towers. 1. Monopine towers shall maintain the natural conical appearance of a loblolly pine tree. Antennas shall be placed a minimum of five feet below the top of the tower, as measured from the highest point of the antenna to maintain said appearance. 2. Foliage shall be green in color and the tower shall be brown in color. The antennas shall be green to blend with the foliage and the foliage shall extend a minimum of one foot beyond the antennas. The foliage shall be UV resistant to reduce degradation and fading and constructed to withstand winds of 110 mph, certification of such shall be supplied with the application. Foliage shall be placed on the tower down to the height of the foliage of surrounding trees. The structure shall have sufficient limbs at the time of initial installation so that there is no gap between the existing canopy and the lower most limbs of the monopine. 3. The installation of the foliage on the monopine shall be installed prior to final inspections. Foliage on the monopine shall be maintained and/or replaced to the specifications established by the engineering detail and specification drawings from the manufacturer/supplier of the alternative tower structure specifically proposed for the site to retain the screening of the antennas. Upon notice from the county that the foliage is in need of maintenance and/or replacement, the tower owner shall have 90 days to make such repairs. i. Flag pole and light pole alternative tower structures shall utilize internal antennas and slick stick design. Flag poles utilized as an alternative tower structure shall be exempt from article V, General provisions, structures permitted above the height limit. (f) Public hearings required to reduce or waive requirements. (1) Public hearings before the planning commission and board of commissioners are necessary to reduce or waive requirements for a proposed tower, antenna, or equipment cabinet or building that cannot comply with the general requirements, and/or supplemental requirements. The procedure for said public hearings shall follow the procedure for rezoning (see article VII of this chapter). Applicants shall apply for public hearings through the planning and zoning department. The application with deadline submittal and public hearing dates is available in the planning and zoning department. The application shall include the following: a. A scaled concept plan, drawn on the signed/sealed survey, graphically indicating the lot and leased area, total tower height including antennas, type and design of the tower structure, the boundary of the tower facility, all applicable setbacks, ingress/egress, landscaping areas, and zoning of the subject property and adjacent property; b. Inventory of existing or planned tower sites. When a proposed tower cannot meet the separation requirements between towers, an inventory of existing or planned tower sites shall be required to sufficiently demonstrate that no existing or planned tower can accommodate the proposed antenna. Each applicant for a new tower shall contact the owners of all existing and planned tower sites, including those located within all adjacent municipalities and counties that are within the search area of the applicant's proposed tower location. The inventory shall be prepared by a radio frequency engineer. The inventory shall include the following information: 1. All tower owners and the number of carriers for each tower site; 2. The site location, total height, and design type of each tower; 3. Details of all existing and planned towers or structures located within the search area and the ability of such to meet the applicant's engineering requirements, including, but not limited to: sufficient height, structural support strength, and electromagnetic interference with antennas on the existing towers or structures; 4. Other limiting factors that render existing towers and structures unsuitable; and 5. Letters of rejection for requests to co-locate on all existing and planned towers within the search area of the proposed tower. The county will engage an independent expert review of the inventory of existing and planned tower sites. If the actual cost to the county for independent expert review of the document is greater than the application fee, the applicant shall be billed for the difference and payment shall be made prior to the hearing before the board of commissioners. An inventory of existing and planned tower sites which is lacking of the information above, as determined by the independent expert, shall require a resubmittal of the lacking information and postpone the tower application to the next scheduled cycle of public hearings. The inventories of existing or planned tower sites are available as an information source to assist other applicants applying for approval under this chapter, provided; however, that the planning and zoning department is not, by sharing such information, in any way representing or warranting that such sites are available or suitable. c. A balloon test shall be conducted prior to the public hearings. The balloon shall be flown for a minimum of four daylight hours from the location of the proposed tower, at the requested height. The application shall include the date and time of the balloon test and an alternative date, in case of inclement weather. The initial balloon test shall be held on a Saturday and the alternative date may be held on any day of the week. A sign announcing the dates of the balloon test shall be posted on the property by the county a minimum of five calendar days prior to the initial balloon test; and d. The applicant shall submit a visual simulation, based on the balloon test, a minimum of seven calendar days prior to the planning commission public hearing. Failure to meet this deadline will postpone the tower application to the next scheduled cycle of public hearings. The visual simulation shall consist of color photographs of the proposed site with the existing view and with a depiction of the proposed tower, from a minimum of four distinct quadrants (generally north, east, south, and west), to demonstrate the visual impact on surrounding properties and streets. An affidavit certifying that the correct location and height of the tower were utilized in the balloon test shall be submitted with the visual simulation photographs. (2) Factors considered in public hearing applications. The following factors shall be considered when evaluating a tower application: a. Height of the proposed tower; b. Distance of the tower to residential structures and residential zoning district boundaries; c. Nature of uses on adjacent and nearby properties; d. Topography of the site and its effect on the efficiency of the tower in terms of coverage; e. Surrounding tree coverage and foliage and its effect on the efficiency of the tower in terms of coverage, as well as, its effect on the visual impact of the tower on surrounding properties and streets; f. Design of the tower, with particular reference to design characteristics that have the effect of reducing or eliminating visual obtrusiveness; g. Proposed ingress and egress; and h. The degree of the tower's compliance with the one statute mile separation (inside the highway corridor) or 11 /2 statute mile separation (outside the highway corridor). In granting its approval to waive or reduce requirements, the county, through the board of commissioners or its designee, may impose conditions that are necessary to minimize the adverse effect of a proposed tower or antenna on adjoining property. A site application shall be submitted within 60 days of the date of approval by the board of commissioners or the proposed tower will no longer be deemed a planned tower. (g) Site application requirements. All applicants for new tower construction shall include the following: (1) Completed application forms signed and notarized; (2) Proof of ownership of the parent tract (latest recorded warranty deed); (3) Site plan prepared by an engineer, architect, or landscape architect registered by the state; (4) Landscape plans (see general requirements); (5) Provide number of carriers based on maximum height of tower; (6) A lease agreement with a minimum of one carrier. (7) Site plan requirements. All tower applicants for new towers shall be required to submit a scaled site plan which complies with all applicable requirements of chapter 104, development regulations. Additional information indicated on the site plan shall include: a. A signed/sealed survey by a land surveyor registered in the state of the parent tract, leased area, and ingress/egress easement, indicating the metes and bounds for each; b. Total tower height including antennas; c. Type and design of any tower facility, including location of equipment buildings or cabinets; d. Fencing and gate details; e. All applicable setbacks for the tower, tower facility, and anchors for guyed tower, as applicable; f. Distance from existing and planned towers; g. Zoning and acreage of parent tract; h. Zoning of adjacent property; and i. Other information necessary to assess compliance with this chapter. Any information of an engineering nature that the applicant submits, whether civil, mechanical, or electrical, shall be certified by a licensed professional engineer. Site plan submittal shall include completion of a tower application, signed and notarized by both the property owner and the tower company representative/agent. (h) Revision to a site plan for the relocation of an existing tower. The relocation of an existing tower shall require the following: (1) The relocation site shall be within the same lot as the existing tower. (2) Submittal of a site plan that meets the specifications of subsection (g) of this section. (3) Letters from all carriers on the existing tower agreeing to the relocation of the tower. (4) The existing tower being replaced shall be removed from the site within 120 calendar days from the date of the issuance of the certificate of occupancy for the relocated tower. (i) Installing an antenna on an existing structure or co-locating or replacing an antenna on an existing tower. The following scenarios shall not require submittal of a site application or site plan: (1) Installing an antenna on an existing structure, so long as said installation adds no more than 20 feet to the height of said existing structure (including buildings, light/utility poles, water towers, or other freestanding nonresidential structures excluding signs and towers). (2) Co-locating or replacing an antenna on any existing tower, so long as, said installation does not increase the height of the tower and/or exceed the maximum height of administrative tower approval for that location and complies with all applicable conditions of approval associated with the tower site. (3) Enlargement of an existing equipment building, or placement of additional equipment cabinets or buildings at a tower site which does not require an enlargement of the existing tower facility. Prior to the co-location or replacement of any antenna on an existing tower, enlargement of an existing equipment building, or placement of additional equipment cabinets or buildings at a tower site, the applicant shall provide written notice to the zoning administrator. The notice shall include a depiction of the location, size, and configuration of such antenna on the existing tower and equipment location within the existing tower facility in reference to an existing site plan and a copy of the FCC license. A certificate of zoning compliance shall be issued by the zoning administrator upon satisfaction of all applicable requirements, and any applicable building permits/inspections shall be required subsequent to the issuance of the certificate of zoning compliance. (j) Site application timeframes. An application shall not be accepted for review unless, at minimum, it includes completed application forms (signed and notarized), proof of ownership of the parent tract (latest recorded warranty deed) and site plan prepared (sealed and signed) by an engineer, architect or landscape architect registered by the state. The zoning administrator has 30 days to determine if an application is complete. Upon notice that an application is incomplete, the applicant has 30 days to submit all necessary information to complete the application. Failure to complete the application in this timeframe shall result in an automatic withdrawal of the application and the proposed tower will no longer be deemed a planned tower and a site application shall not be submitted for the same property for 60 days. The county shall act on applications for co-locations within 90 days and all other applications within 150 days. If the zoning administrator requests additional information within the 30-day review period as mentioned above, the time it takes the applicant to respond will not count towards the 90- or 150-day timeframe limits. (k) FAA determination. Prior to the approval and issuance of the certificate of zoning compliance, a copy of a FAA determination including "Does Not Exceed," "Exceeds But Okay," or "Determination of No Hazard" shall be submitted within the 90- or 150-day timeframe limits, as applicable. Failure to submit the determination in these timeframes shall result in an automatic withdrawal of the application, and the proposed tower will no longer be deemed a planned tower, and a site application shall not be submitted for the same property for 60 days. Any tower that receives a "Determination of Hazard" shall be denied. (l) FCC license. Prior to the approval and issuance of the certificate of zoning compliance, a copy of the FCC license shall be submitted within the 90- or 150-day timeframe limits, as applicable. Failure to submit the copy of FCC license in these timeframes shall result in an automatic withdrawal of the application, and the proposed tower will no longer be deemed a planned tower, and a site application shall not be submitted for the same property for 60 days. (m) Private airport or heliport zone. A one statute mile zone is established around any private airport or heliport that is registered with the FAA to prevent a hazard to aviation operations. Since the FAA does not make a determination for a private airport or heliport, a supplemental Federal Aviation Regulations Part 77/FAA Form 7460 study and a "No Hazard" letter prepared by a firm on the GDOT prequalified 1.08 Airport Master Planning list shall be submitted within the 90- or 150-day timeframe limits for an antenna or a tower that is proposed within this zone, as applicable. Any tower that creates a hazard for a private airport or heliport shall be denied. (n) Tower approval expiration. Approval of a site application by the applicable departments for a tower shall expire 12 months from the date of approval and will no longer be deemed a planned tower, unless a certificate of occupancy has been issued for the tower or the building permit remains active. (Code 1992, § 20-5-45; Ord. No. 2012-09, § 3, 5-24-2012; Ord. No. 2012-13, § 3, 12-13-2012; Ord. No. 2013-20, § 2, 11-14-2013; Ord. No. 2020-02, § 4, 5-28-2020; Ord. No. 2021-02, §§ 1—4, 1-28-2021)