--- title: Fayette County Zoning Ordinance, Section 15-6-67 collection: local-codes id: local-code:fayette-county/zoning/15-6-67 cite_as: Fayette County, Ga., Zoning Ordinance § 15-6-67 canonical_url: https://georgiacommons.org/code/local/fayette-county/zoning/15-6-67 md_url: https://georgiacommons.org/code/local/fayette-county/zoning/15-6-67.md text_url: https://georgiacommons.org/code/local/fayette-county/zoning/15-6-67/text source_url: https://library.municode.com/ga/fayette_county/codes/code_of_ordinances date: 2026-05-28 status: active jurisdiction: county:fayette jurisdiction_name: Fayette County county_fips: "13113" corpus_version: local-codes-fayette-county-a7a551bedadd publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/fayette-county/zoning/~part-ii/~part-b/~chapter-104/~article-xv.md previous: https://georgiacommons.org/code/local/fayette-county/zoning/104-596.md next: https://georgiacommons.org/code/local/fayette-county/zoning/part-ii-part-b-chapter-104-article-xv-15-6-67.md index: https://georgiacommons.org/code/local/fayette-county.md branch: zoning edition: As published by Municode, current through 2026-05-28 edition_date_kind: current_through source_publisher: Municode version_id: local-code:fayette-county/zoning/15-6-67@2026-05-28-65ec44f3eb --- # Fayette County Zoning Ordinance, Section 15-6-67 > As published by Municode, current through 2026-05-28 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - COUNTY CODE / Part B - LAND DEVELOPMENT AND LAND USE / Chapter 104 - DEVELOPMENT REGULATIONS / Article XV - SUBDIVISION REGULATIONS (40) Monuments. Show the location, material and description of all monuments. (41) Monuments. Provide a permanent benchmark on site, per § 104-598 of the Subdivision Regulations. (42) Easements. Show location, purpose, width and/or dimensions of any easement of record and/or easements within the subdivision. Provide a note if there are no recorded easements found associated with the property. (43) State waters. Delineate and label all state waters within the subdivision and all state waters around the property that have floodplain, jurisdictional wetlands, or watershed protection buffers and setbacks that extend into the subdivision property. Provide a note if there are no state waters. (44) Watershed protection. Delineate watershed protection buffers and setbacks per article VII of the development regulations. Label as "Watershed Protection Buffer" and "Watershed Protection Setback." Show the 1,000-ft watershed protection impact boundary, if applicable. (45) Floodplain. Provide a flood hazard certification statement. Reference the FIRM panel number and date. (Current FEMA maps are dated 9/26/2008) (46) Floodplain. Delineate and label all flood hazard areas (natural and manmade, including cross drains). Provide 100-year flood elevations for each hazard area. Reference the source(s) of any flood hazard data shown on the final plat. (47) Floodplain. Indicate the minimum finish floor elevation (MFFE) at least three ft above the 100-year flood elevation or one ft above the future flood plain conditions, whichever is greater, for each lot containing a flood hazard area. Provide the following note if applicable: "Lot(s) (Lot No.) either contain or are adjacent to a Special Flood Hazard Area identified in the Fayette County 2013 Limited Detail Flood Study. As required by Art. IV of the Development Regulations a minimum finished floor elevation is established for the lowest floor elevation including a basement by this study." (48) Stormwater. Identify and label all stormwater management control structures (inlets, pipes, headwalls, BMPs, etc.) within the project. The nomenclature should match that used for the project's inspection and maintenance agreement for stormwater management controls. Stormwater controls shall be on commonly-owned property. (49) Delineate any groundwater recharge areas as required in the groundwater area protection ordinance. Provide a note if there is no groundwater recharge areas on the property. (50) Indicate the location of a cemetery (if applicable, see Fayette County Code, chapter 12, article VII. Cemeteries, burial grounds, human remains, and burial objects) and provide a 20 foot access/maintenance easement to and around the cemetery. (51) Include the following statement: "Fayette County does not accept the ownership, maintenance or responsibility for any drainage easement or overall drainage plan, or the lack of one, indicated by this plat." (52) Include the following statements on the face of the plat: STORMWATER MANAGEMENT INSPECTION & MAINTENANCE The property conveyed herein is subject to the restrictive covenants of the Homeowners Association and an Inspection and Maintenance Agreement for Stormwater Management Controls recorded in Deed Book , page . Failure to satisfy the inspection and maintenance requirements of the above-referenced agreement may result in enforcement action by the County, including but not limited to, judgment liens against the property owners and/or Homeowners Association. The inspection and maintenance agreement is recorded with the Clerk of Courts. A copy of the agreement is available at the Fayette County Environmental Management Department. If required by the Environmental Management Department, include the following statement: WETLAND DELINEATION I, (name) of (organization) do hereby certify that I have field inspected the property known as (subdivision name) on (date) and determined that the property � contains � does not contain jurisdictional wetlands as defined by the U.S. Army Corps of Engineers. _________________________________ Signature of Wetland Delineator _________________________________ Company Address & Telephone Or, if approved by the Environmental Management Department, include the following statement: "Per the national wetlands inventory, the site (does/does not) contain jurisdictional wetlands. Any jurisdictional wetlands on the site are under the jurisdiction of the U.S. Army Corps of Engineers. Property owners may be subject to penalty by law for disturbance to these jurisdictional wetland areas without proper authorization. (53) Delineate any adjacent drainage easements, lakes, ponds or stormwater management facilities, structures and streams within 100 feet of boundary which may be impacted by development. (54) Label proposed street names and address numbers on each lot for each street frontage(s). (55) Indicate and label the location of fire hydrants on all proposed streets and all fire hydrants (existing or proposed) on existing streets adjacent to the subdivision. 01.06 Fire Hydrant placement required at 600 feet intervals for residential subdivision development. 01.05 Fire Hydrant placement required at 400 feet intervals for non-residential subdivision development. (56) Indicate and label the location of all water lines in the right-of way and include the following statement: "If lots are to be served by the Fayette County Water System from an existing water main, taps and services shall be provided at the developers/ homebuilders expense and all applicable meter and availability fees shall also be applied. Water main taps shall be observed by Water System personnel with a 48 hour lead time - 770-461-1146 (option 5). (NOTICE: Any changes to property lines that differ from approved Construction Plans which results in a water meter on an adjacent lot will require the developer to relocate the water meter at their expense.) (57) Submittals. The following submittals and checks shall be satisfied prior to final plat approval, as applicable. a. Core sample report (development regulations, article III of this chapter). b. Soil density tests (development regulations, article III of this chapter). c. Utilities-power, gas, and water installed (development regulations, article III of this chapter). d. Stormwater management plan (development regulations, article XIII of this chapter). e. Stormwater operations and management plan (development regulations, article XIV of this chapter). f. Storm sewer installation report (development regulations, article III of this chapter). g. Stormwater management inspection and maintenance agreement (development regulations, article XIII of this chapter). h. Stormwater as-built plan (development regulations, article XIV of this chapter). i. Performance bond/irrevocable letter-of-credit (Subdivision regulations, section 104-600). Amount . j. Maintenance bond/irrevocable letter-of-credit (Subdivision regulations, section 104-600). Amount . k. Environmental management department final inspection. (Call department to schedule.) l. Master erosion and sedimentation control plan. (58) Other considerations. a. An application may be submitted to the planning and zoning department for the board of commissioners' authorization of motorized cart use in the subdivision after recordation of the final plat (see chapter 26, motor vehicles and traffic and the home page www.fayettecountyga.gov for application). b. A petition may be submitted to the environmental management department for the board of commissioners' authorization for the subdivision to become a street light district after recordation of the final plat (chapter 20, article II, pertaining to street lights). (c) The minor final plat. The minor final plat shall contain all of the following requirements and certification statements and any additional information required to address any state and/or federal requirements. Sheet design: The minor final plat and/or a revision to a recorded minor final plat shall be formatted so when printed the maximum sheet size shall be no more than 24 inches by 36 inches. The following shall be indicated on the minor final plat: (1) The title block shall state: "Minor Final Plat of " A revision to a minor final plat must state "Revised Minor Final Plat of " and also purpose of revision and date of revision. Within the title block include County, State, land district(s) and land lot(s). (2) Indicate date of plat preparation; provide scale of drawing, stated and shown graphically (Georgia Plat Act). (3) Provide a north arrow (to state plane grid north) and vicinity map of such a scale that the subdivision may be readily located and identified within the county. (4) Provide a legend for all abbreviations. (5) Provide an index of sheets if more than one sheet is provided. (6) Provide signature blocks for county approval: environmental health, environmental management, county engineer/designee, planning commission secretary/designee, zoning administrator/designee, and fire marshal/ designee. (7) Provide name, address, and telephone number of owner and/or developer. (8) Provide name, address, and telephone number of the engineer, surveyor, and/or landscape architect including seal, signature, and Georgia registration number. The design profession must be licensed in the State of Georgia. (9) Show all land lot lines; land district lines; city and/or county boundaries intersecting or adjacent to the subject property. (10) Show exterior property lines with bearings and distances of subject property. (11) Provide zoning and property owner name and/or subdivision name of all adjacent properties. (12) Show location, purpose, and width of any easements of record. Provide a note if there are no existing easements associated with the property. (13) Within the general notes, indicate the zoning district; minimum lot sizes; front, side and rear setbacks; and minimum house size. (14) Provide total acreage of tract and total number of lots. (15) Provide rezoning information, including petition number, date of approval and exact wording of any rezoning conditions (if applicable); and any approved variances including petition number and date of approval (if applicable). (16) All applicable zoning regulations shall be indicated on the minor final plat. Show front, side, and rear setback lines as dashed lines. Indicate minimum lot width at the front building line on each lot (see section 110-77 of the zoning ordinance). (17) Provide the square footage area and the acreage to the 1/100 th acre on each lot; label the lot numbers; show the bearings & distances of all lots; and identify the parent tract, if applicable. (18) Indicate in notes how subdivision lots will be served (i.e. public water, individual well, septic tank or public sewer). (19) Identify all existing structures and features and label as "to remain" or "to be removed." Structures to remain must be shown on individual lots and meet all applicable zoning requirements. "Features" include railroads, sewers, bridges, culverts, drain pipes, water mains, cemeteries, etc. Provide a note if there are no existing structures or features on the property. (20) Indicate the boundaries and area to 1/100 th acre for any common areas (i.e. signage, landscaping, cluster mailbox, open space, etc.) Label as "Common Area—Not a Building Lot." (21) Contiguous Areas—Provide the contiguous area of each lot to the 1/100 th acre on each lot or in a table. (See section 104-597(3)) (22) Provide the following statements on the face of the plat. OWNER'S CERTIFCATE I/we, the undersigned, certify that as the legal owner/owners of the subject property, I/we hereby authorize the submittal of this Final Plat for the subdivision of my/our property. Owner Date Mortgagee Date _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ (If property dedication is required, provide the following statement on the face of the plat.) We, the undersigned owner(s) and/or mortgagee(s) of the Subdivision, hereby offer to dedicate, deed and/or reserve for public use the rights-of-way, easements and other ground shown on this plat. All property contained within the required right-of-way of all existing streets adjacent to the subdivision as indicated hereon, shall be dedicated and conveyed at no cost to Fayette County, a political subdivision of the State of Georgia, upon recordation of said Final Plat with the Fayette County Clerk of Superior Court. Owner Date Mortgagee Date _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ (23) Georgia Rule. Show the direction and distance from a point of reference to a point on the boundary of the survey. The point of reference shall be an established, monumented position which can be identified or relocated from maps, plats, or other documents on public record. (24) Georgia Rule. Show the closure precision of the field survey. This may be stated as follows: "The field data upon which this map or plat is based has a closure precision of one foot in feet, and an angular error of per angle point, and was adjusted using rule." If the surveyor determines that a closure precision statement is not appropriate for the survey because a substantial portion of the field measurements were obtained using Global Positioning Systems, then a note of precision or positional accuracy may be placed in compliance with rule 180-7-.09; or if the surveyor feels that a closure precision statement is not appropriate for the survey because redundant linear measurements were used to verify accuracy, the calculated positional tolerance shall be stated and shall comply with rule 180-7-.03. (25) Georgia rule. Show the closure precision of the data shown on the plat. The closure may be stated as follows: "This map or plat has been calculated for closure and is found to be accurate within one foot in feet." (26) Georgia rule. For traditional survey equipment, state the type of equipment used to obtain the linear and angular measurements used in preparation of the plat. When GPS equipment is used in performing the survey. A note stating what portion (or all) of the survey was performed using GPS equipment. Note the type of GPS equipment used, including manufacturer and model number, and whether single or dual frequency receivers were used Note the type of GPS survey that was performed, such as static, real time kinemeatic ("RTK"), network adjusted real time kinematic, etc. A note that discloses the precision of the GPS work done, either in relative positional accuracy, vector closure, or other mathematical expression chosen by the land surveyor. (27) Surveying. Provide line and curve data for all right-of-way, parcel/lot boundaries, and easements. Line data shall include bearing and length. Curve data shall include the arc length, radius, chord length and chord bearing. (28) Surveying. Lengths shall be expressed to the nearest one-hundredth (1/100th) of a foot. Angles shall be shown to the nearest second. The error of closure shall not exceed one foot in ten thousand feet. (29) Corner lots. Fillet (20-ft radius) or chamfer (20 feet along tangent legs) corner property lines at street intersections, including existing road intersections forming a portion of the parcel boundary being subdivided. (30) Prior to Minor Final Plat approval, the Engineer or Surveyor shall provide a Sight Distance Assessment form (available from Fayette County EMD) to the Fayette County Environmental Management Department for each proposed lot fronting an existing road. Fayette County will deny the creation of a new lot that can't meet minimum intersection sight distance requirements. (31) The surveyor shall provide the following, minimum, information with respect to existing and/or proposed streets: a. As-built centerline and edge of pavement of all existing roads adjacent to the subject parcel(s). b. Existing cross drains and driveway culverts. Indicate direction of flow. c. Centerline and edge-of-pavement of intersecting roads. d. Existing utilities, to include waterline lines, meters, vaults, fire hydrants, power poles, guy wires, cable boxes, phone boxes, etc. e. Other improvements or structures within the existing and proposed right-of-way, such as fences, signs, driveways, etc. f. Existing right-of-way lines and existing right-of-way widths as measured from the subject parcels to road centerlines. g. Proposed right-of-way lines as determined by establishing a best-fit existing road centerline and then offsetting the centerline � the required right-of-way width. (The required right-of-way width shall be determined from the Fayette County Thoroughfare Plan and Development Regulations.) Indicate the distance from the centerline to the new right-of-way at the original boundary property lines and at one location close to the center of the lots being developed, as appropriate. (32) Provide the following statements on the face of the plat. SURVEYOR'S CERTIFICATE I hereby certify that this plat is true and correct and was prepared from an actual survey of the property by me or under my supervision; that all monuments and infrastructure shown hereon actually exist or are marked as "future"; and their location, size, type and material are correctly shown. By: GA Registered Land Surveyor - Signature and License Number Date ENGINEER'S CERTIFICATEE I hereby certify that accepted engineering practices and design methods were used to establish the layout of this development; that the streets, drainage structures and other design features have been constructed according to the development's approved Construction Drawings; and that all applicable requirements of Fayette County's Development Regulations and Subdivision Regulations have been fully complied with. By: GA Professional Engineer - Signature and License Number Date Plat Act. As required by subsection (d) of O.C.G.A. Section 15-6-67, this plat has been prepared by a land surveyor and approved by all applicable local jurisdictions for recording as evidenced by approval certificates, signatures, stamps, or statements hereon. Such approvals or affirmations should be confirmed with the appropriate governmental bodies by any purchaser or user of this plat as to intended use of any parcel. Furthermore, the undersigned land surveyor certifies that this plat complies with the minimum technical standards for property surveys in Georgia as set forth in the rules and regulations of the Georgia Board of Registration for Professional Engineers and Land Surveyors and as set forth in O.C.G.A.