Sec. 13.4. Construction Field Office.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A manufactured homes or other temporary buildings or structures shall not be occupied as a permanent office or for any other use in any district; provided, however that such manufactured homes or other temporary buildings or structures may be used

for a temporary office on a site where a non-residential development is under construction, subject to the following:

(a) Approval and Permit. Approval by the Zoning Administrator and issuance of a building permit. Said permit shall be temporary but

renewable once after a period of six (6) months. Said permit shall only be issued if plans and permit(s) have been approved for one or more permanent buildings on the subject property.

(b) Water and Sewer. Adequate water and sewage disposal for the structure(s) is approved by the Hall County Environmental Health

Department.

(c) Additional Installation Provisions. The Zoning Administrator is authorized to require additional installation standards to ensure

compatibility of appearance and functional safety of the construction field office and the site on which it is located.

(d) Removal Upon Occupancy. Said manufactured home(s) or temporary building or structure(s) shall be removed from the site no later than upon the occupancy of the appropriate permanent building(s) or structure(s) intended for such use.

History

The history line the source prints at the end of the section.

(Ord. No. 348-17, § 1(Exh. A), 8-2-2018)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:flowery-branch/zoning/13.4@2026-11-11-6b2b10321c

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Flowery Branch Zoning Ordinance, Sec. 13.4. Construction Field Office | Georgia Commons