Skip to content
Georgia Commons
Menu

Flowery Branch · Zoning Ordinance

Appendix C - ZONING ORDINANCE / Article 14 - SPECIFIC PROVISIONS FOR PRINCIPAL NONRESIDENTIAL

Sec. 14.15. Application Requirements for Uses

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Specified in this Article.

In addition to the requirements for conditional use applications as specified in this Zoning Ordinance, if applicable, all applicants for any use specified by this Article shall submit to the Zoning Administrator the following information for review and approval:

(a) Plat. A copy of the recorded plat for the subject property.

(b) Site Plan. The site plan required by this Zoning Ordinance, which must show areas proposed for the handling and storage of overburden, by-products, and/or excavated materials including the estimated type and volume of extraction.

(c) Operations Plan. An operations plan, which shall include: the date of commencement of operation and its expected duration and the proposed hours of operation.

(d) State or Federal Permit Documents. A copy of all documents submitted or prepared for submission to the Georgia Department of Natural Resources or any other state or federal regulatory agency, as may be required, for the purpose of obtaining a state permit or

federal authorization.

(e) Review by Georgia Department of Transportation.A statement from the Georgia Department of Transportation which shall identify any state-maintained road within or adjacent

to the subject property, and which shall identify any repaving, repairs, alterations, turning lanes, or other additions necessary to accommodate the potential increase in traffic volume or weight occasioned by the proposed operations.

(f) Review by City Engineer. A statement from the City Engineer or other qualified professional which identifies all city roads within or adjacent to the property and which shall

identify any repaving, repairs, alterations, turning lanes, or other additions necessary to accommodate the potential increase in traffic volume or weight occasioned by the proposed operations.

(Ord. No. 348-16, § 1 (Exh. A), 7-19-2018; Ord. No.

657, § 1(Exh. A), 12-16-2021)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:flowery-branch/zoning/14.15@2026-11-11-a3f1d40347

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Flowery Branch Zoning Ordinance, Sec. 14.15. Application Requirements for Uses | Georgia Commons