Flowery Branch · Zoning Ordinance
Appendix C - ZONING ORDINANCE / Article 15 - TOWERS AND WIRELESS TELECOMMUNICATION FACILITIES
Sec. 15.4. Application Requirements.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Each application shall include the following, which are in addition to the information required for conditional use applications generally, if required:
(a) A recorded plat or boundary survey.
(b) A site plan, based on with topographical information.
(c) An elevation view, perspective drawing, or simulated photograph of how the proposed telecommunication tower will look from public rights-of-way and surrounding residential streets from which it will be visible once
constructed.
(d) Supporting engineering calculations and information which provide evidence of need and document radio frequency range, coverage area, and tower height requirements.
The application must specifically address whether there is a technically suitable space available on an existing tower or other location within the search area (i.e., the grid for the placement of the antenna), and such
information shall specifically include the location of all existing towers within a one-mile radius of the site proposed.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.