Skip to content
Georgia Commons
Menu

Flowery Branch · Zoning Ordinance

Appendix C - ZONING ORDINANCE / Article 21 - PARKING

Sec. 21.11. Stormwater Requirements for Large

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Parking Lots.

All off-street parking lots with ten or more spaces and/or establishments dispensing petroleum based products shall be required to have an oil/water separator device designed and constructed and shown in the stormwater management plan. Such device

shall be approved by the City Engineer and shall be the responsibility of the property owner for maintenance and operation.

History

The history line the source prints at the end of the section.

(Ord. No. 348-17, § 1(Exh. A), 8-2-2018)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:flowery-branch/zoning/21.11@2026-11-11-d0a4ddc7a8

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Flowery Branch Zoning Ordinance, Sec. 21.11. Stormwater Requirements for Large | Georgia Commons