(a) As part of the first application requirement encountered by an applicant, whether that is for approval of a preliminary subdivision plat, permit for land-disturbing activity, development plan approval, or permit for a building, road, or driveway, in addition to other requirements specified for such application, as the case may be, the applicant shall be required to submit a topographical survey of the project site. (b) Notes and details of existing terrain shall be shown over the required topographic information. Said topographic survey may exclude areas not proposed for development, in order to reduce the costs to applicants. (c) Where existing available information on topography is deemed sufficient, the Zoning Administrator may waive the requirement for a topographic survey. A topographic survey shall be required by the Zoning Administrator for any application for land-disturbing activity where reliable data on existing topography, including quadrangle map of the U.S. Geological Survey or other topographic maps which may be available, do not provide sufficient detail to administer the requirements of this Article. (d) Said topographic survey, if required by the Zoning Administrator pursuant to this Section, shall provide contour intervals of no more than five (5) feet unless otherwise approved by the Zoning Administrator.