The following specific activities are exempt from this Article. Exemption of these activities does not constitute an exemption for any other activity proposed on a property. (a) Activities for the purpose of building one of the following: 1. A stream crossing by a driveway, transportation route or utility line; 2. Public water supply intake or public wastewater outfall structures; 3. Intrusions necessary to provide access to a property; 4. Public access facilities that must be on the water including boat ramps, docks, foot trails leading directly to the river, fishing platforms and overlooks; 5. Unpaved foot trails and/or impervious paths; 6. Activities to restore and enhance stream bank stability, vegetation, water quality and/or aquatic habitat, so long as native vegetation and bioengineering techniques are used. (b) Public sewer line easements paralleling the stream, except that all easements (permanent and construction) and land disturbance should be at least 50 feet from the top of the bank. This includes such impervious cover as is necessary for the operation and maintenance of the utility, including but not limited to manholes, vents and valve structures. This exemption shall not be construed as allowing the construction of roads, bike paths (unless impervious) or other transportation routes in such easements, regardless of paving material, except for access for the uses specifically cited in this Section. (c) Land development activities within a right-ofway existing at the time this ordinance was first effective, or which are permitted under the terms of this Article. (d) Within an easement of any utility existing at the time this Article first took effect or approved under the terms of this Article, land disturbance activities and such impervious cover as is necessary for the operation and maintenance of the utility, including but not limited to manholes, vents and valve structures. (e) Emergency work necessary to preserve life or property. However, when emergency work is performed under this subsection, the person performing it shall report such work to the Zoning Administrator on the next business day after commencement of the work. Within 10 days thereafter, the person shall apply for a permit and perform such work within such time period as may be determined by the City to be reasonably necessary to correct any impairment such emergency work may have caused to the water conveyance capacity, stability or water quality of the protection area. (f) Forestry and silviculture activities not incidental to other land development activity. If such activity results in land disturbance in the buffer that would otherwise be prohibited, then no other land disturbing activity other than normal forest management practices will be allowed on the entire property for three years after the end of the activities that intruded on the buffer.