--- title: Flowery Branch Zoning Ordinance, Sec. 32.22. Construction Stage Submittal Requirements collection: local-codes id: local-code:flowery-branch/zoning/32.22 cite_as: Flowery Branch, Ga., Zoning Ordinance § 32.22 canonical_url: https://georgiacommons.org/code/local/flowery-branch/zoning/32.22 md_url: https://georgiacommons.org/code/local/flowery-branch/zoning/32.22.md text_url: https://georgiacommons.org/code/local/flowery-branch/zoning/32.22/text source_url: https://library.municode.com/ga/flowery_branch/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:flowery-branch jurisdiction_name: Flowery Branch place_fips: "1330340" corpus_version: local-codes-flowery-branch-79922c0a26fa publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/flowery-branch/zoning/~appendix-c/~article-32.md previous: https://georgiacommons.org/code/local/flowery-branch/zoning/32.21.md next: https://georgiacommons.org/code/local/flowery-branch/zoning/32.23.md index: https://georgiacommons.org/code/local/flowery-branch.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:flowery-branch/zoning/32.22@2026-11-11-ae4f3a5952 --- # Flowery Branch Zoning Ordinance, Sec. 32.22. Construction Stage Submittal Requirements > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix C - ZONING ORDINANCE / Article 32 - FLOODPLAIN MANAGEMENT For all new construction and substantial improvements on sites with a floodplain management/flood damage prevention plan, the permit holder shall provide to the Zoning Administrator the certifications required by this Section. (a) Surveyor or Engineer Certification. A certified as-built Elevation Certificate or Floodproofing Certificate for non-residential construction including the lowest floor elevation or flood-proofing level immediately after the lowest floor or flood-proofing is completed. A final Elevation Certificate shall be provided after completion of construction including final grading of the site. Any lowest floor certification made relative to mean sea level shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. (b) Floodproofing Certificate. When flood-proofing is utilized for non-residential structures, said certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same. (c) Prior Work. Any work undertaken prior to approval of these certifications shall be at the permit holder's risk. (d) Deficiencies and Stop Work Order. The Zoning Administrator shall review the above referenced certification data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further work being allowed to proceed. Failure to submit certification or failure to make the corrections required hereby shall be cause to issue a stop work order for the project. ## History (Ord. No. 578, § 1, 8-1-2019)