--- title: Flowery Branch Zoning Ordinance, Sec. 32.27. Engineering Study Required for Floodplain Encroachments collection: local-codes id: local-code:flowery-branch/zoning/32.27 cite_as: Flowery Branch, Ga., Zoning Ordinance § 32.27 canonical_url: https://georgiacommons.org/code/local/flowery-branch/zoning/32.27 md_url: https://georgiacommons.org/code/local/flowery-branch/zoning/32.27.md text_url: https://georgiacommons.org/code/local/flowery-branch/zoning/32.27/text source_url: https://library.municode.com/ga/flowery_branch/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:flowery-branch jurisdiction_name: Flowery Branch place_fips: "1330340" corpus_version: local-codes-flowery-branch-79922c0a26fa publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/flowery-branch/zoning/~appendix-c/~article-32.md previous: https://georgiacommons.org/code/local/flowery-branch/zoning/32.26.md next: https://georgiacommons.org/code/local/flowery-branch/zoning/32.28.md index: https://georgiacommons.org/code/local/flowery-branch.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:flowery-branch/zoning/32.27@2026-11-11-1862ac9e4d --- # Flowery Branch Zoning Ordinance, Sec. 32.27. Engineering Study Required for Floodplain Encroachments > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix C - ZONING ORDINANCE / Article 32 - FLOODPLAIN MANAGEMENT (a) An engineering study is required, as appropriate to the proposed development activities on the site, whenever a development proposes to disturb any land within the future-conditions floodplain, except for a residential single-lot development on streams without established base flood elevations and/or floodways for which the provisions this Article shall otherwise apply. (b) This study shall be prepared by a currently registered Professional Engineer in the State of Georgia and made a part of the application for a permit. (c) This information shall be submitted to and approved by the Zoning Administrator prior to the approval of any permit which would authorize the disturbance of land located within the future-conditions floodplain. ## History (Ord. No. 578, § 1, 8-1-2019)