(a) An engineering study is required, as appropriate to the proposed development activities on the site, whenever a development proposes to disturb any land within the future-conditions floodplain, except for a residential single-lot development on streams without established base flood elevations and/or floodways for which the provisions this Article shall otherwise apply. (b) This study shall be prepared by a currently registered Professional Engineer in the State of Georgia and made a part of the application for a permit. (c) This information shall be submitted to and approved by the Zoning Administrator prior to the approval of any permit which would authorize the disturbance of land located within the future-conditions floodplain.