The provisions of this Article are minimum standards for flood loss reduction; therefore, any deviation from the standards through the variance process must be weighed carefully. In reviewing variance requests, the Zoning Administrator and Governing Body shall consider all technical evaluations, relevant factors, and all standards specified in this Article. A variance shall be issued only when the following requirements are met: (a) There is a finding of good and sufficient cause; (b) There is a determination that failure to grant the variance would result in exceptional hardship; and, (c) There is a determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, or the creation of a nuisance; (d) Variances shall only be issued upon determination that the variance is the minimum necessary, considering the flood hazard, to afford relief; and, in the instance of a historic structure, a determination that the variance is the minimum necessary so as not to destroy the historic character and design of the building (Ord. No. 578, ยง 1, 8-1-2019)