--- title: Flowery Branch Zoning Ordinance, Sec. 41.6. Building Permit collection: local-codes id: local-code:flowery-branch/zoning/41.6 cite_as: Flowery Branch, Ga., Zoning Ordinance § 41.6 canonical_url: https://georgiacommons.org/code/local/flowery-branch/zoning/41.6 md_url: https://georgiacommons.org/code/local/flowery-branch/zoning/41.6.md text_url: https://georgiacommons.org/code/local/flowery-branch/zoning/41.6/text source_url: https://library.municode.com/ga/flowery_branch/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:flowery-branch jurisdiction_name: Flowery Branch place_fips: "1330340" corpus_version: local-codes-flowery-branch-79922c0a26fa publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/flowery-branch/zoning/~appendix-c/~article-41.md previous: https://georgiacommons.org/code/local/flowery-branch/zoning/41.5.md next: https://georgiacommons.org/code/local/flowery-branch/zoning/41.7.md index: https://georgiacommons.org/code/local/flowery-branch.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:flowery-branch/zoning/41.6@2026-11-11-b3f4b163bb --- # Flowery Branch Zoning Ordinance, Sec. 41.6. Building Permit > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix C - ZONING ORDINANCE / Article 41 - PERMITS AND CERTIFICATES (a) The Building Inspector is hereby authorized to issue building permits in accordance with all provisions of this zoning ordinance and only after the Zoning Administrator has issued a development permit or if no development permit is required, after review of said building permit for compliance with the provisions of this zoning ordinance. (b) No building, or other structure shall be erected, moved, extended or enlarged, or structurally altered, nor shall any excavation, grading, or filling of any lot for the construction of any building or structure be commenced until the Building Inspector has issued a building permit for such work in conformity with the provisions of this zoning ordinance. (c) Approval of a building permit shall require an application to the Building Inspector as specified in the building and related codes of the city. If the building permit is denied, the Building Inspector shall state in writing the reason for the denial and the applicant shall be notified of the denial. A record of all building permits shall be kept on file in the office of the Building Inspector and copies shall be furnished on request to any person. (d) Any building permit issued shall become invalid unless the work authorized by it shall have been commenced within one-hundred-twenty (120) days of its date of issue, or if the work authorized by it is suspended or abandoned for a period of six (6) months. ## History (Ord. No. 348-18, § 1 (Exh. A), 9-6-2018)