(a) If the tree preservation requirements of this article make reasonable use of a property impossible or if a tree in a tree protection area is irreparably damaged, the following replacement requirements shall be followed after the construction process is complete. (1) The trees shall be replaced diameter inch for diameter inch with a minimum of three-inch DBH trees of the same species. If the species of the existing tree is unsuitable for replacement, as identified in section 8-8-137(b), or is unavailable, an inch for inch replacement of minimum three-inch DBH trees of a suitable species, as identified in section 8-8-137(b), shall be planted. (2) All trees selected for replacement must be quality specimens free of disease, injury, or infestation, and must be ecologically compatible with the specifically intended growing area as identified in section 8-8-137(b). (3) All replacement trees must be planted before a certificate of occupancy is issued or streets and easements will be accepted. ( 4) Replacement trees planted shall fall under the maintenance provisions of the City of Forest Park Urban Design Review Board, as identified in section 8-8-161, design approval procedures. (5) Specimen trees shall be replaced with specimen trees and understory trees shall be replaced with understory trees as identified in section 8-8-137(b). (6) Where the minimum twenty (20) percent tree density cannot be met due to natural site constraints, the developer or builder shall provide the remaining balance of the required trees for planting on public property. (b) Alternative compliance. (1) Overview. In those instances where the available land within a project site cannot bear the total number of canopy and/or understory trees required by this ordinance, the city hereby establishes an alternative compliance program. Alternative compliance shall be limited to either an off-site planting program or a contribution to the city's tree bank fund as described herein and in section [8-8-137(b)(4)]. (2) Consideration of alternative compliance shall adhere to the following guidelines: a. All canopy and understory trees that can reasonably be planted on a project site shall be provided. The remaining trees shall be considered for alternative compliance. b. In no instance shall more than fifty (50) percent of the canopy and understory trees required by this ordinance be met through alternative compliance. c. Requests for alternative compliance shall be considered as a part of the established landscape plan review process. (3) Off-site planting program. Off-site planting provides an opportunity to utilize canopy and understory trees to re-vegetate city-owned property, open space, recreation facilities and road rights-of-way. Off-site plantings shall be permitted on city-owned property only. Locations for off-site plantings and species of trees shall be identified by the planning and development director or his/her designee prior to preparation of the off-site planting plan. Off-site planting shall be considered in accordance with the following guidelines: a. An off-site planting plan shall be provided as a part of the landscape plan submittal package, and shall include, at a minimum, the location, species and size of all trees proposed to meet the established tree replacement requirements. b. The landscape plan and the off-site planting plan shall be reviewed and approved by the planning and development director or his/her designee and the planning commission as a part of the landscape plan approval process. c. Off-site plantings shall be installed in accordance with current American National Standards Institute (ANSI) guidelines and procedures. d. The applicant shall guarantee all off-site plantings in accordance with the maintenance criteria and plant guarantee requirements identified herein. e. All off-site plantings shall be installed and approved by the planning and development director or his/her designee prior to the issuance of a certificate of occupancy as described herein. f. The following note shall be provided on the approved off-site planting plan: The plant material identified on this plan was approved by the planning and development director or his/her designee and the planning commission in accordance with the city's off-site planting program. Along with the approved landscape plan, it is understood this off-site planting fulfills the tree replacement requirements for the development located at as established by the city's landscape ordinance. This off-site planting plan shall be attached to the approved landscape plan and shall be maintained by the planning and development director or his/her designee. (4) Tree bank fund. Contributions to the city's tree replacement fund shall be considered in accordance with the following guidelines: The intent of this chapter is to ensure that a minimum density of trees is maintained on all developed sites. Occasionally, this intent cannot be met because a project site will not bear the required density of trees. In this case, the community development director may approve a contribution to the city's tree replacement fund. The following standards have been established for administering these contributions: a. The director of planning and community development must review and approve all requests for alternative compliance. b. In no instance shall more than fifty (50) percent of the required site density be met through alternative compliance. c. As many trees as can reasonably be expected to survive must be planted on the site in question. This may require planting fewer trees of a larger caliper than the minimum required caliper. d. A permit shall not be issued until the required contribution has been made to the tree replacement fund or until other agreed upon terms with the City of Forest Park have been satisfied. e. Tree replacement cost estimates obtained from three (3) landscape contractors must be provided to the City of Forest Park for approval. The tree replacement cost will be based on an average of the three (3) estimates plus ten (10) percent. The required replacement fee shall be one hundred (100) percent of the total cost to plant the balance of trees that were unable to be planted to satisfy the site density requirement or recompense tree requirements. f. The tree bank fund shall be used for purchasing, planting and maintaining trees on public property. Funds may be used to purchase forested greenspace or conducting courses on tree management and similar topics. Funds may also be used for the creation of landscape plans involving the planting of trees and landscape material on public property. (c) Trees suitable for replacement trees and unsuitable as replacement trees: (1) Trees suitable as replacement trees for specimen trees: Southern Red Oak Pecan Northern Red Oak Hickory White Oak Red Maple Willow Oak Florida Maple Birch Yellow Birch Sourwood Sugar Maple (2) Trees suitable for the replacement of understory trees: Service Berry Aristocrat Pear Crape Myrtle American Holly Cherry Plum Fringe Tree Coosa Dogwood Virginia Pine Kwanzan Cherry Red Bud Red Buckeye Carolina Silver Bell (3) Trees unsuitable for replacement: Eastern Hemlock Eastern White Pine Lombardy Poplar Mimosa Norway Pine Paper Birch Silver Maple Spruce Box Elder Willow Royal Paulownia Tree of Heaven (Ord. No. 22-14, ยง 2(Exh. B), 9-6-2022)