Skip to content
Georgia Commons
Menu

Fort Oglethorpe · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT CODE / Chapter 6 - NATURAL RESOURCE PROTECTION / Article 4 - STORMWATER MANAGEMENT

Sec. 4.16. Construction inspections of post-development stormwater management system.

About this text

  • As published by Municode, current through 2026-03-26
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Inspections to ensure plan compliance during construction.

(1) Periodic inspections of the stormwater management system construction shall be conducted by the staff of the city or conducted and certified by a professional engineer who has been approved by the city. Construction inspections shall utilize the approved stormwater management plan for establishing compliance.

(2) All inspections shall be documented with written reports that contain the following information:

a. The date and location of the inspection;

b. Whether construction is in compliance with the approved stormwater management plan;

c. Variations from the approved construction specifications; and

d. Any other variations or violations of the conditions of the approved stormwater management plan.

(3) If any violations are found, the applicant shall be notified in writing of the nature of the violation and the required corrective actions.

(b) Final inspection and as built plans.

(1) Upon completion of a project, and before a certificate of occupancy shall be granted, the applicant is responsible for certifying that the completed project is in accordance with the approved stormwater management plan.

(2) After final construction is completed, all applicants are required to submit actual "as built" plans for any stormwater management facilities or practices. The plan must show the final design specifications for all stormwater management facilities and practices and must be certified by a professional engineer.

(3) A final inspection by the city is required before the release of any performance securities can occur.

History

The history line the source prints at the end of the section.

(Ord. No. 2021-10, § 1, 6-28-2021)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:fort-oglethorpe/zoning/4.16@2026-03-26-e08d22425a

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Fort Oglethorpe Zoning Ordinance, Sec. 4.16. Construction inspections of post-development stormwater management system | Georgia Commons