--- title: Fort Oglethorpe Zoning Ordinance, Sec. 4.10 (Appendix A, Chapter 6, Article 4). Stormwater concept plan and consultation meeting collection: local-codes id: local-code:fort-oglethorpe/zoning/appendix-a-chapter-6-article-4-4.10 cite_as: Fort Oglethorpe, Ga., Zoning Ordinance, Appendix A, Chapter 6, Article 4, § 4.10 canonical_url: https://georgiacommons.org/code/local/fort-oglethorpe/zoning/appendix-a-chapter-6-article-4-4.10 md_url: https://georgiacommons.org/code/local/fort-oglethorpe/zoning/appendix-a-chapter-6-article-4-4.10.md text_url: https://georgiacommons.org/code/local/fort-oglethorpe/zoning/appendix-a-chapter-6-article-4-4.10/text source_url: https://library.municode.com/ga/fort_oglethorpe/codes/code_of_ordinances date: 2026-03-26 status: active jurisdiction: city:fort-oglethorpe jurisdiction_name: Fort Oglethorpe place_fips: "1330956" corpus_version: local-codes-fort-oglethorpe-bb4b9cc35932 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/fort-oglethorpe/zoning/~appendix-a/~chapter-6/~article-4.md previous: https://georgiacommons.org/code/local/fort-oglethorpe/zoning/appendix-a-chapter-6-article-4-4.9.md next: https://georgiacommons.org/code/local/fort-oglethorpe/zoning/appendix-a-chapter-6-article-4-4.11.md index: https://georgiacommons.org/code/local/fort-oglethorpe.md branch: zoning edition: As published by Municode, current through 2026-03-26 edition_date_kind: current_through source_publisher: Municode version_id: local-code:fort-oglethorpe/zoning/appendix-a-chapter-6-article-4-4.10@2026-03-26-3396a0a921 --- # Fort Oglethorpe Zoning Ordinance, Sec. 4.10 (Appendix A, Chapter 6, Article 4). Stormwater concept plan and consultation meeting > As published by Municode, current through 2026-03-26 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT CODE / Chapter 6 - NATURAL RESOURCE PROTECTION / Article 4 - STORMWATER MANAGEMENT (a) Before any stormwater management permit application is submitted, it is required that the land owner or developer shall meet with the city for a consultation meeting on a concept plan for the post-development stormwater management system to be utilized in the proposed land development project. This consultation meeting shall take place at the time of the preliminary plan of subdivision or other early step in the development process. The purpose of this meeting is to discuss the post-development stormwater management measures necessary for the proposed project, as well as to discuss and assess constraints, opportunities and potential ideas for stormwater management designs before the formal site design engineering is commenced. (b) To accomplish this goal the following information shall be included in the concept plan which shall be submitted in advance of the meeting: (1) Existing conditions/proposed site plans. Existing conditions and proposed site layout sketch plans, which illustrate at a minimum: Existing and proposed topography; perennial and intermittent streams; mapping of predominant soils from soil surveys unless it is determined that the site has previously been filled, then an on-site soil study must be conducted; boundaries of existing predominant vegetation and proposed limits of clearing and grading; and location of existing and proposed roads, buildings, parking areas and other impervious surfaces. (2) Natural resources inventory. A written or graphic inventory of the natural resources at the site and surrounding area as it exists prior to the commencement of the project. This description should include a discussion of soil conditions, forest cover, topography, wetlands, and other native vegetative areas on the site, as well as the location and boundaries of other natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains, stream buffers and other setbacks (e.g., drinking water well setbacks, septic setbacks, etc.). Particular attention should be paid to environmentally sensitive features that provide particular opportunities or constraints for development. (3) Stormwater management system concept plan. A written or graphic concept plan of the proposed post-development stormwater management system including: Preliminary selection and location of proposed structural stormwater controls; location of existing and proposed conveyance systems such as grass channels, swales, and storm drains; flow paths; location of floodplain/floodway limits; relationship of site to upstream and downstream properties and drainages; and preliminary location of proposed stream channel modifications, such as bridge or culvert crossings. (c) Local watershed plans, the city or county greenspace projection plan (if applicable), and any relevant resource protection plans will be consulted in the discussion of the concept plan. ## History (Ord. No. 2021-10, § 1, 6-28-2021)