(a) The developer is encouraged to place all utilities underground. (b) The street right-of-way shall be graded at least six feet, measured from the back of the curb or edge of the pavement on both sides of the street, to provide space for the installation of utilities, to prevent the encroachment of driveways into the street surface, to provide walkways off the paved vehicular surface, and to provide space for the future installations of sidewalks; provided, however, the city council may waive this section in cases where the subdivider can demonstrate that the topography of the land being subdivided is such that compliance with this section would be impractical.