(a) Connection to public system. Where a public water supply is within 300 feet of the subdivision, the subdivider shall install all water lines which meet the requirements of the state water quality control department as are necessary to connect to the public water system. (b) Construction. All new water lines shall be constructed with ductile iron pipe, with the exception of the upgrading or rehabilitation of existing water mains. The use of other pipe type, materials, and methods is permissible when rehabilitation by excavation is not practical due to the existence of structures or close proximity of other utilities or when the expectation of damage or interruption of other utility services is a high probability. (c) Water service. The consumer shall furnish and maintain a private cutoff valve on the consumer's side of the meter.