(a) Construction requirements. (1) All new sewer force mains shall be constructed with ductile iron pipe, with the exception of the upgrading or rehabilitation of existing sewer force mains. The use of other pipe type, materials, and methods is permissible when rehabilitation by excavation is not practical due to the existence of structures or close proximity of other utilities or when the expectation of damage or interruption of other utility services is a high probability. (2) No public sewer shall be less than eight inches in diameter. (3) Pipe to be laid regardless of size and material must properly be bedded and backfield. (4) Bedding must be crushed stone. (5) Four-inch through 12-inch sewer pipe must have four inches of bedding. Sewer pipe 12 through 15 inches must have eight inches of bedding. (6) Pipes not in location of streets must be backfield four inches above the pipe with same bedding material. (7) For a pipe to be laid in streets, the pipe must be backfield with crusher run to top of the ditch in layers of 12 inches and tamped separately. (8) Pipe must be lay flat and uniform. No turns will be allowed without the installation of manholes. (9) All sewers shall be designed to give mean velocities when flowing full, of not less than two feet per second. (10) Building sewers shall be provided in accordance with the International Plumbing Code and the following requirements: a. For building sewers eight inches and larger manholes shall be provided and located not more than 200 feet from the junction of the building drain and building sewer, at each change of direction and at intervals of not more than 400 feet apart. b. Manholes and manhole covers shall be of an approved type, however no manhole shall be smaller than 48 inches in diameter. (11) All ditch crossings will be properly piered and designed, approved and passed on before constructed. (12) All sewers that are covered without an inspection will be uncovered to meet the requirements of the inspector. (13) All sewer laterals for house connection must be installed in the same manner as main lines. (14) All laterals must be properly marked as to location and plotted on a map such detail map in digital form and .DXF or .DWG format. (15) Only one structure per lateral will be permitted. (16) No sewer lateral shall be approved without a back-flow preventer on said lateral. (b) Separate sewers for buildings with multiple dwelling units or other units. A minimum eight-inch sewer line which connects all private sewer lines of condominium units shall be required. This eight-inch sewer line shall be publicly dedicated to the city by way of easement in order that the city may enter the property of the condominium association and service said eight-inch sewer line. (c) Specifications for building sewers. (1) The size, slope, alignment, materials of construction of a building sewer, and the methods to be used in excavating, placing of the pipe, jointing, testing, and backfilling the trench shall all conform to the requirements of the International Plumbing Code or other applicable rules and regulations of the city. (2) In the absence of code provisions or in amplification of such provisions, the materials and procedures set forth in appropriate specifications of the A.S.T.M. and W.P.C.F. Manual of Practice No. 9 shall apply. (d) Elevation of sewer. Whenever possible, the building sewer shall be brought to the building at an elevation below the basement floor. In all buildings in which any building drain is too low to permit gravity flow to the public sewer, sanitary sewage carried by such building drain shall be lifted by an approved means and discharged to the building sewer. (e) Specifications for connections. (1) The connection of the building sewer into the public sewer shall conform to the requirements of the International Plumbing Code or other applicable rules and regulations of the city, or the procedures set forth in appropriate specifications of the A.S.T.M. and the W.P.C.F. Manual of Practice No. 9. (2) All such connections shall be made gastight and watertight. (3) Any deviation from the prescribed procedures and materials must be approved by the water and sewer director before installation.