(a) Quality assurance. Quality assurance during construction will be required. (1) All quality control testing which is a part of roadway construction will be performed by a reputable professional geo-technical and testing engineering company that will be employed by the developer and all associated costs will be paid by the developer. (2) The developer shall select a geotechnical engineering firm from the current Georgia Department of Transportation (GDOT) list of qualified professionals, or a firm acceptable to the city, and notify the public works department of that selection. The following requirements shall apply: a. The geotechnical firm shall contract directly with the developer to provide quality assurance on the project. b. The developer shall be responsible for scheduling the geotechnical firm. c. Minimum testing requirements are described in this article. d. Location and scheduling of testing shall be coordinated with the city's representative for assurance of reasonable conformance with the requirements described in this chapter prior to performing tests to avoid the expense of retesting. e. Testing milestones shall be established during the pre-application phase described in chapter 8 of this code. f. A final report shall be required in accordance with section 4.16 below.