--- title: Fort Oglethorpe Zoning Ordinance, Sec. 4.3 (Appendix A, Chapter 7, Article 4). Subgrade collection: local-codes id: local-code:fort-oglethorpe/zoning/appendix-a-chapter-7-article-4-4.3 cite_as: Fort Oglethorpe, Ga., Zoning Ordinance, Appendix A, Chapter 7, Article 4, § 4.3 canonical_url: https://georgiacommons.org/code/local/fort-oglethorpe/zoning/appendix-a-chapter-7-article-4-4.3 md_url: https://georgiacommons.org/code/local/fort-oglethorpe/zoning/appendix-a-chapter-7-article-4-4.3.md text_url: https://georgiacommons.org/code/local/fort-oglethorpe/zoning/appendix-a-chapter-7-article-4-4.3/text source_url: https://library.municode.com/ga/fort_oglethorpe/codes/code_of_ordinances date: 2026-03-26 status: active jurisdiction: city:fort-oglethorpe jurisdiction_name: Fort Oglethorpe place_fips: "1330956" corpus_version: local-codes-fort-oglethorpe-bb4b9cc35932 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/fort-oglethorpe/zoning/~appendix-a/~chapter-7/~article-4.md previous: https://georgiacommons.org/code/local/fort-oglethorpe/zoning/appendix-a-chapter-7-article-4-4.2.md next: https://georgiacommons.org/code/local/fort-oglethorpe/zoning/appendix-a-chapter-7-article-4-4.4.md index: https://georgiacommons.org/code/local/fort-oglethorpe.md branch: zoning edition: As published by Municode, current through 2026-03-26 edition_date_kind: current_through source_publisher: Municode version_id: local-code:fort-oglethorpe/zoning/appendix-a-chapter-7-article-4-4.3@2026-03-26-5bc48429e8 --- # Fort Oglethorpe Zoning Ordinance, Sec. 4.3 (Appendix A, Chapter 7, Article 4). Subgrade > As published by Municode, current through 2026-03-26 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT CODE / Chapter 7 - INFRASTRUCTURE IMPROVEMENTS / Article 4 - STREET CONSTRUCTION STANDARDS (a) All contractors must contact the geotechnical engineer prior to beginning subgrade work. This is imperative or the work may not be accepted. (b) The subgrade shall be prepared to the lines and grades as designed and staked by the developers' surveyor. All grades shall be verified by the design professional for final approval by the city. (c) After the subgrade has been graded and shaped, it shall be scarified to a depth of eight inches, then re-compacted to achieve a density of at least 98 percent of the standard Proctor (ASTM D698) maximum dry density. (1) The moisture content shall be within three percent of the optimum moisture content. (2) The geotechnical engineer will conduct field density tests at a spacing of not more than 100 feet, staggered right and left of the centerline, with a minimum of three tests. (3) Any areas that do not meet compaction requirements shall be re-compacted and retested. (d) If an existing subgrade passes both the proof rolling and density tests, then scarifying and re-compacting will not be required. (1) Proof rolling shall be performed using a fully-loaded, dual-tandem dump truck. (2) The subgrade shall be trafficked by parallel passes of the truck starting at one side of the roadway. Each pass shall overlap the preceding pass to ensure complete coverage. (3) Two complete proof rolling coverages are required. ## History (Ord. No. 2021-10, § 1, 6-28-2021)