(a) After the base course has been thoroughly compacted and worked to the lines and grades as shown on the typical cross section, it shall be dampened if necessary. (b) GDOT approved asphalt emulsion primers may be used according to Section 412 of the Georgia Department of Transportation's "Standard Specifications Construction of Transportation Systems" (latest edition). Application shall be in accordance with manufacturers recommendations. (c) The type and grade of prime material shall depend on the condition of the base course and shall be approved by the geotechnical engineer and the director of public works. The prime coat may be eliminated if approved by the geotechnical engineer and the director of public works.