(a) Backfill behind curbs shall be completed promptly after the curbs are installed. (b) Until the backfill behind curbs is completed, measures should be taken to minimize infiltration of water to the pavement sub grade. (c) Careful attention must be given to slope of backfill to prevent water penetration behind curbs.