Fort Oglethorpe · Zoning Ordinance
Appendix A - UNIFIED DEVELOPMENT CODE / Chapter 8 - PROCEDURES AND PERMITS / Article 7 - SUBDIVISION PLAT APPROVAL
Sec. 7.1. General procedures.
About this text
- As published by Municode, current through 2026-03-26
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Two-step process.
(1) The procedure for review and approval of the subdivision plat consists of two separate steps.
a. The initial step is the preparation and submission to the director of building, planning and zoning of a preliminary plat of the proposed subdivision.
b. The second step is the preparation and submission to the director of building, planning and zoning of a final plat, together with required certificates. This final plat becomes the instrument to be recorded in the office of the clerk of the county superior court, when approved and signed by the director of building, planning and zoning. All final plats must be stamped and in recordable form under the laws of the state.
(b) Exceptions.
(1) The following subdivisions are exempt from the requirements of this article in accordance with the provisions of this section:
a. Plats which are developed solely with frontage on an existing road, which contain ten lots or fewer, and in which no public improvements (such as new streets, stormwater drainage facilities or public utilities) are to be made.
b. The combination or recombination of portions of previously platted lots where the total number of lots is not increased and the resultant lots comply with this development code and with all ordinances and resolutions of the city.
(2) Plats for exempted subdivisions shall be prepared in accordance with the applicable requirements for final subdivision plats under section 7.3, Requirements for plats to be submitted and section 7.6, Final plat approval.
(3) The stormwater carrying capacity of the road, whether in an existing ditch or gutter, shall not be compromised. If the stormwater characteristics of the existing road are inadequate to accommodate the new lots, the public works director may require improvement of the roadway ditch and associated drainage structures as appropriate.
(4) Approval of final plat by the director of building, planning and zoning will authorize recordation of the plat with the clerk of the superior court.
(5) Prior to recordation of the final plat, no lots may be sold, and building permits and driveway permits on the lots may not be obtained.
(6) Land subdivided under the provisions of this section 7.1(b) may not be re-subdivided under the provisions of this section 7.1(b). Any further subdivision of a lot or tract created by approval of a plat under this section 7.1(b) must be accomplished following all procedures for subdivision plat approval that follow in this article.
History
(Ord. No. 2021-10, § 1, 6-28-2021)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.