--- title: Fort Oglethorpe Zoning Ordinance, Article 6. CONSTRUCTION SCHEDULE collection: local-codes id: local-code:fort-oglethorpe/zoning/article-6 cite_as: Fort Oglethorpe, Ga., Zoning Ordinance, Article 6 canonical_url: https://georgiacommons.org/code/local/fort-oglethorpe/zoning/article-6 md_url: https://georgiacommons.org/code/local/fort-oglethorpe/zoning/article-6.md text_url: https://georgiacommons.org/code/local/fort-oglethorpe/zoning/article-6/text source_url: https://library.municode.com/ga/fort_oglethorpe/codes/code_of_ordinances date: 2026-03-26 status: active jurisdiction: city:fort-oglethorpe jurisdiction_name: Fort Oglethorpe place_fips: "1330956" corpus_version: local-codes-fort-oglethorpe-bb4b9cc35932 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/fort-oglethorpe/zoning/~appendix-a/~chapter-7/~article-6.md previous: https://georgiacommons.org/code/local/fort-oglethorpe/zoning/appendix-a-chapter-7-article-5-5.3.md next: https://georgiacommons.org/code/local/fort-oglethorpe/zoning/appendix-a-chapter-7-article-7-7.1.md index: https://georgiacommons.org/code/local/fort-oglethorpe.md branch: zoning edition: As published by Municode, current through 2026-03-26 edition_date_kind: current_through source_publisher: Municode version_id: local-code:fort-oglethorpe/zoning/article-6@2026-03-26-607429caca --- # Fort Oglethorpe Zoning Ordinance, Article 6. CONSTRUCTION SCHEDULE > As published by Municode, current through 2026-03-26 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT CODE / Chapter 7 - INFRASTRUCTURE IMPROVEMENTS / Article 6 - CONSTRUCTION SCHEDULE (a) No construction activity of any kind, including grading, installation of improvements shall begin on any land within the jurisdiction of these regulations without prior approval of the construction plans. (b) Grading or land disturbing activities may commence only after a land disturbance permit has been issued. (c) Utility installation shall not occur until the public works department has approved the rough grade of the street and shoulder. (d) Periodic inspection during the installation of the required improvements in a development may be made by the public works department to ensure conformity with the approved plans and specifications. Such inspections will be made at the following stages of construction: (1) At the completion of clearing and stump removal. (2) Beginning of grading operation to ensure proper compaction. (3) During the installation of storm sewer cross drains. (4) During the construction of curb and gutter, lateral storm drains, and storm drainage structures. (5) Beginning of subgrade preparation and after subgrade preparation. (6) Beginning of base installation and at the completion of base installation. (7) Beginning of asphalt installation. (8) At the completion of all grading and stabilization of shoulders through the following methods: a. Hydroseeding. b. Wheat/Rye straw at 75 percent minimum coverage. c. Wood mulch at a minimum of six inches thick. d. Sod. (9) During the life of the project for proper erosion and sedimentation control. ## History (Ord. No. 2021-10, ยง 1, 6-28-2021)