(a) Tree protection plan requirements: Any proposal for development or improvement of any tract of land shall include a tree protection/replacement plan, including trees to be planted in order to meet the minimum requirements of this Ordinance. Such plan shall be submitted, along with other permit drawings, to the planning and economic development department prior to any clearing, grubbing, grading or other removal of the existing vegetation that may affect the health of existing tree coverage. No tree removal shall occur prior to approval of the tree protection plan. The tree protection plan may be submitted as part of a developer's landscape plan, provided that all required information is legible, or as a separate drawing which includes, as a minimum, the following: (1) Name, address, and phone number of owner of record and applicant. (2) Boundary lines of the tract by lengths and bearings, streets adjoining the property, total area of the tract, land lot, land district, north point, graphic scale, and date. (3) Surveyed location of all specimen trees and their critical root zones. Indicate those specimen trees proposed for removal or for protection. Removal of specimen trees is subject to city's approval. When encroaching on the critical root zone of a specimen tree, indicate the percent of impact. ( 4) Approximate location of all trees or stands of trees proposed to be protected and their critical root zone. Only trees that are designated on the tree protection plan will be counted towards density requirements. (5) Location of proposed buildings, structures and paved areas. (6) Locations of all existing and proposed utility lines. (Utility lines must be placed along corridors outside critical root zones of trees which will remain on the site.) (7) Limits of land disturbance, clearing, grading, and trenching. (8) Limits of tree protection areas, showing trees to be maintained and planted, specifying species and size. (9) Grade changes or other work adjacent to a tree, which would affect it adversely, with drawings or descriptions as to how the grade, drainage, and aeration will be maintained around the tree. (10) Methods of tree protection shall be indicated for all tree protection zones, including tree fencing, retaining walls, tunneling for utilities, aeration systems, transplanting, staking, signage, etc. (11) Procedures and schedules for the implementation, installation, and maintenance of all tree protection measures. (12) Plan should indicate staging areas for parking, materials storage, concrete washout, and debris burn where these areas might affect tree protection. (13) The required site tree density factor must be satisfied. Compliance shall be clearly demonstrated on the tree protection plan. Existing trees or stands of trees used in the density calculation must be clearly indicated on the drawing. A summary table of the number of existing trees to remain and new trees to be planted, by diameter shall be shown along with the calculations showing tree density achieved for the site. (14) Additional information as required on a case-by-case basis. This could include, but is not limited to, a certified arborist's appraisal of the tree's viability and projected life span. (15) Tree protection plans must be prepared and sealed by a landscape architect licensed to practice in the State of Georgia or a certified arborist. (16) The following notes shall be indicated on both the tree protection plan and the grading plan in large bold letters. Additional notes may be required on a case-by-case basis. a. Contact the planning and economic development department to arrange a pre-construction conference with the city prior to any land disturbance. b. All tree protection measures shall be installed and inspected prior to the start of any land disturbance and maintained until final landscaping is installed. call the planning and economic development department for an inspection by the city. c. No parking, storage, or any other construction activities are to occur within tree protection areas. d. A maintenance inspection of trees will be performed after two full growing seasons from the date of the final construction inspection. Project owners at the time of the maintenance inspection are responsible for ordinance compliance. e. All landscape material installation shall conform to the current standards of the American Standard for Nursery Stock (ANSI z60.1-2004) and are subject to approval by the city.