(a) The building inspection office is charged with inspecting manufactured homes to ensure compliance with local and state guidelines. Inspections shall include by not be limited to the following: (1) Safety and aesthetic inspection shall be performed on pre-owned manufactured homes. (2) Site inspection shall be performed on each site prior to placement of the manufactured home. (3) Installation inspection shall be performed before the power company has connected service to the home. (4) Skirting inspection shall be performed 30 days after the installation inspection to assure that skirting, landings and handrails are in place. (b) To the extent possible, inspections will be scheduled within 48 hours of notification that the manufactured home has been installed is ready for inspection excluding Saturday, Sunday and city-observed holidays. (c) Upon completion of the installation inspection, and if the manufactured home is in compliance with this chapter, the code enforcement office shall notify the power company to connect the electrical service to the home. (d) No manufactured home shall be occupied prior to the installation inspection being done and approved.