A. Merger When the owner of two or more contiguous lots of record having (a) continuous frontage and (b) a single structure that crosses the property line between the two contiguous lots applies for a building permit that increases the footprint of the structure, such lots of record shall be merged and shall be considered a single lot for purposes of this Zoning Ordinance. No permit shall be issued for more than one (1) principal use on the merged lot. A. Through Lots On a through lot, the front yard setback applies to each street frontage. B. Average Front Yard 1. When the average front yard of nearby lots is developed with buildings that have front yards less than required by the zoning district, the minimum required front yard will match the average existing front yard of such lots, but in no case be less than 10 feet. 2. The lots used to determine the average existing front yard shall include: a. All lots within 100 feet of the subject lot (measured from the closest lot line to closest lot line); and b. On the same side of a street as the subject lot between two intersecting streets; and c. In the same zoning district as the subject lot. C. Encroachments into Yards The following may encroach into required yards: 1. Trees or plant material. 2. Fences and landscape walls. 3. Side and Rear Yards Only: Heating units, air conditioning units and other HVAC equipment, generators, and pool equipment, all whether elevated or on grade, provided that the top of any such equipment may not exceed six (6) feet above grade. 4. Electric Vehicle (EV) charging stations. 5. Ordinary projections of eaves provided that they do not project more than 18 inches into any required yard. 6. Sidewalks and driveways.