A. Tree Plan Requirements Owners of property on St. Simons Island requiring development approval in the form of a land disturbance permit or building permit, must prepare and submit a proposed Tree Plan for review concurrently with an application for development approval. The proposed Tree Plan must be in the form of a to-scale plan prepared by a registered surveyor, registered engineer, registered landscape architect, or registered architect properly sealed by the preparer, and must include the following information: 1. Property line with bearings and distances, easements, marsh and wetland delineations, and other information necessary to calculate development area; 2. A tree survey noting the location all trees of 12 inches DBH or greater plus any smaller preferred species trees proposed to be saved on the property. Trees must be identified by the common name and DBH. 3. For trees that are proposed to be preserved - the common name, DBH, location of the trunk, the amount and location of open soil area for the tree(s), the boundaries of the tree protection zone, and the location of protective fencing; 4. For trees that are proposed to be removed - the common name, DBH, and the location of the trunk, clearly marked with an “X” to denote the proposed removal; 5. For planted trees – the common name, the caliper and height at time of planting, the amount and location of open soil area for the tree, the boundaries of the tree protection zone, and the location of protective fencing; 6. Glynn County trees – the locations of any and all Glynn County trees whose required open soil area extends onto the property, the common name of each tree, DBH, location of the trunk, the amount and location of open soil area for the trees, the boundaries of the tree protection zone, and the location of protective fencing; 7. Specimen trees – the locations of any and all specimen trees, the common name of each tree, DBH, and whether the tree will be preserved; 8. The locations of existing and proposed structures, paving, driveways, cut and fill areas, detention areas, utility lines, and easements; 9. If applicable, the locations and details of all permanent tree protection measures (tree wells, aeration systems, permeable paving, retaining walls, bollards, etc.); and 10. Calculations showing compliance with the tree canopy requirements using trees to be preserved and trees to be planted. B. Review Process for Tree Plans Required for Development Plan Applications 1. Tree plans must be submitted to the Planning & ZoningDepartment as part of the development plan application. Tree plans will be submitted to the County Arborist for review. The County Arborist will coordinate and schedule a site visit with the applicant and/or their agent. After the site review, the County Arborist must advise the applicant of any recommended changes to the applicant’s proposed tree plan that are necessary to comply with this section. The County Arborist will forward the proposed tree plan to the Planning & Zoning Department with a recommendation. 2. The Islands Planning Commission must consider Tree Plans filed concurrent with the application for development plan approval. No such development plan may be deemed approved unless and until the accompanying Tree Plan is approved by the Islands Planning Commission. 3. The Islands Planning Commission must consider the recommendations of the County Arborist in making its decision whether the proposed Tree Plan complies with the technical standards and protection requirements of this section. The Islands Planning Commission may approve, approve with conditions, deny, or defer action on a proposed Tree Plan. When denying a Tree Plan, the Planning Commission must include the reasons for such denial in its motion.