--- title: Glynn County Zoning Ordinance, 4.6.5. Resource Extraction collection: local-codes id: local-code:glynn-county/zoning/4.6.5 cite_as: Glynn County, Ga., Zoning Ordinance ยง 4.6.5 canonical_url: https://georgiacommons.org/code/local/glynn-county/zoning/4.6.5 md_url: https://georgiacommons.org/code/local/glynn-county/zoning/4.6.5.md text_url: https://georgiacommons.org/code/local/glynn-county/zoning/4.6.5/text source_url: https://content.glynncounty.org/sites/default/files/2026-11/Glynn%20County%20Zoning%20Ordinance%20As%20Amended%2011-05-26.pdf date: 2026-11-23 status: active jurisdiction: county:glynn jurisdiction_name: Glynn County county_fips: "13127" corpus_version: local-codes-glynn-county-bf907a842bd2 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/glynn-county/zoning/~article-4.md previous: https://georgiacommons.org/code/local/glynn-county/zoning/4.6.4.md next: https://georgiacommons.org/code/local/glynn-county/zoning/4.6.6.md index: https://georgiacommons.org/code/local/glynn-county.md branch: zoning edition: As posted on the county's website, retrieved 2026-11-23 edition_date_kind: retrieved source_publisher: county website (glynncounty.org) version_id: local-code:glynn-county/zoning/4.6.5@2026-11-23-3384b4e534 --- # Glynn County Zoning Ordinance, 4.6.5. Resource Extraction > As posted on the county's website, retrieved 2026-11-23 Part of: Article 4 - USE PROVISIONS / 4.6 - Industrial Uses A. Defined A facility that extracts soil, gravel, sand, stone, or clay from land. Resource extraction includes the following: 1. Borrow pit. 2. Dredging landfill. 3. Soil, gravel, sand, stone, or clay extraction and related processing and storage. 4. Surface mining, quarry. B. Regulations 1. Area, Yard, Height and Buffer Requirements. a. Minimum lot width at street R/W: 200 feet. b. Front yard setback (from right-of-way): 150 feet c. Side yard setback (from property line): 50 feet d. Rear yard setback (from property line): 50 feet e. Maximum building and structure height: 75 feet f. Buffers: Buffers shall be either 100, 500 or 1,000 feet in width, depending on use or type of mining. See below. 2. Special Buffer Provisions. a. Resource extraction involving blasting or using of explosives (e.g., granite and limestone quarrying), or drilling for oil or natural gas or other hydrocarbons, shall require a 1,000-foot buffer when abutting a different district. No drilling shall be conducted within 1,000 feet of a preexisting well supplying drinking water. b. Resource extraction not involving blasting or use of explosives, but involving heavy excavators and large excavations or removal of overburden (e.g., strip mining, open pit mining, and some subsurface mining), shall require a 500-foot buffer when abutting a different district. c. Shallow surface resource extraction (mining on the surface not exceeding a depth below preexisting grade of ten (10) feet) is permitted with a 100-foot vegetated buffer. d. Any question of the appropriate buffer width shall be left to the interpretation of the Planning & Zoning Department, who shall be provided site plans and operational descriptions as required to make the necessary determination.