--- title: Gordon County Zoning Ordinance, 10.03.04. Procedures for Single Lot Development collection: local-codes id: local-code:gordon-county/zoning/10.03.04 cite_as: Gordon County, Ga., Zoning Ordinance ยง 10.03.04 canonical_url: https://georgiacommons.org/code/local/gordon-county/zoning/10.03.04 md_url: https://georgiacommons.org/code/local/gordon-county/zoning/10.03.04.md text_url: https://georgiacommons.org/code/local/gordon-county/zoning/10.03.04/text source_url: https://library.municode.com/ga/gordon_county/codes/unified_land_development_code date: 2024-03-19 status: active jurisdiction: county:gordon jurisdiction_name: Gordon County county_fips: "13129" corpus_version: local-codes-gordon-county-1c9bbdb767b1 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/gordon-county/zoning/~chapter-5.md previous: https://georgiacommons.org/code/local/gordon-county/zoning/10.03.03.md next: https://georgiacommons.org/code/local/gordon-county/zoning/10.03.05.md index: https://georgiacommons.org/code/local/gordon-county.md branch: zoning edition: As published by Municode, current through 2024-03-19 edition_date_kind: current_through source_publisher: Municode version_id: local-code:gordon-county/zoning/10.03.04@2024-03-19-97d494c111 --- # Gordon County Zoning Ordinance, 10.03.04. Procedures for Single Lot Development > As published by Municode, current through 2024-03-19 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Chapter 5 A. Residential Single Lot Development 1. Residential single lot development which does not result in the construction of any new streets shall be exempt from the subdivision requirements of this ULDC. 2. Residential single lot development shall be governed by the requirements contained in this ULDC. 3. Any residential single lot development which results in land-disturbing activities, as defined in Section 3.06.00, shall obtain a permit as required by said section. B. Nonresidential Single Lot Development 1. Nonresidential single lot development which does not result in the construction of any new streets shall be exempt from the subdivision requirements of this ULDC. 2. In addition to meeting the requirements of this ULDC, nonresidential single lot developments shall meet the following requirements, and shall submit five (5) copies of site development plans to the County. 3. Small additions, phases, or expansions to existing buildings which do not result in any negative site impacts are not required to submit site development plans. 4. Electric substations, cellular telephone towers, water and sewer pumping stations, and similar uses which are not subject to public traffic and are limited in area to less than one and one tenth (1.1) acres are not required to submit site development plans. The County may require additional information if it is determined that these facilities may have a negative site impact. 5. All proposed off-street parking lots shall meet all requirements of this ULDC, and be designed as illustrated in Standard Detail 209 "Off-street Parking". 6. All driveways providing access to the street shall be designed as illustrated in Standard Detail 210 "Nonresidential Driveways" and Standard Detail 211 "Non residential Driveway Landing Requirements on Existing Streets". A deceleration lane will be required if the proposed development will generate more than five hundred (500) ADT, as determined in the current edition of ITE's Trip Generation manual. 7. Stormwater Management a. Stormwater management structures shall be provided by the developer as required in Chapter 3 and Chapter 6 of this ULDC. b. All proposed stormwater management structures shall be designed and certified by an appropriate state approved professional, and shall be subject to the approval of the County. c. Stormwater management structures shall be designed based on a twenty-fiveyear storm event. The drainage formula used in design of all drainage structures shall be determined by the developer's appropriate state approved professional and based on sound engineering practice. d. Energy dissipation devices shall be installed at all discharge points of storm drains-in compliance with the approved soil erosion and sediment control plan. At a minimum, an area of rip rap six (6) times the pipe diameter in length and two (2) times the pipe diameter in width shall be provided. If the exit velocity from the pipe will exceed ten (10) fps, rip rap set in concrete, stilling basins, baffle wall basins, impact blocks or other energy dissipation devices approved by the County shall be required. e. All pipes in a County right-of-way shall be a minimum of eighteen (18) inches in diameter. No storm drain pipe parallel to any existing or proposed County roads shall be placed beneath a proposed deceleration lane without the approval of the County. f. Each site shall be analyzed for stormwater runoff flow patterns. Where a wet weather stream exists between a proposed road and the building line on a lot, the design professional shall size the driveway culvert as if the driveway was at the lowest point on the lot. The construction plans and the final plat shall show the minimum driveway pipe size required. g. All developments shall be required to submit a hydrology study certified by an appropriate state approved professional which shall discuss the effects of off-site drainage, increased runoff from the site, and existing conditions downstream of the development. The study shall show that drainage from this development will not adversely affect downstream property owners within the limits stated below. h. If hydrologic studies and examination show that the proposed development will increase stormwater runoff by more than seven (7.0) cfs for a 100-year storm, then the proposed development shall be required to include storage and release mechanisms such that rainwater from impervious areas will leave the site at the same rate, over the same period, as was characteristic of the unmodified site. No building permit shall be granted unless storage and release is provided for the water volume generated by a 100-year storm. i. The following criteria shall be used in determining the needs for detention facilities: i. If the amount of increased runoff due to the development is no more than seven (7.0) cfs for a 100-year storm, detention facilities are not required if downstream street culverts are adequately sized to pass the 100-year storm without overtopping the road. ii. If the development abuts and drains into a studied stream, detention facilities are not required, provided that existing street culverts are adequately sized to pass the 100-year storm without overtopping the road and the property immediately upstream of the culvert is undeveloped. The County may determine that the detention facility requirement can be waived if the developer upgrades the street culvert. iii. If there are adequately sized street culverts downstream of the proposed development that will pass a 100-year storm without overtopping the road and the runoff can be adequately conveyed to a studied stream, then no detention facilities are required. iv. If the downstream system is inadequate to pass the 100-year storm, the developer is required to detain the increased runoff (provided the runoff increase is greater than seven (7.0) cfs for a 100-year storm), and only release that amount of runoff produced by the property prior to development. The hydrology study necessary to design retention and detention facilities must be certified by an appropriate state approved professional. j. Detention facilities shall be designed for the two-, five-, ten-, 25-, 50- and 100-year storm events. The reservoir routing methods or an equivalent method shall be used in sizing the detention facility. The bowstring method is not allowed. k. The emergency outflow device for the detention facility shall be designed to pass the 100-year developed inflow without overtopping the dam. l. Detention facility discharge locations shall be in defined drainage ditches. The developer's appropriate state approved professional shall include in the hydrology study a discussion of existing conditions downstream of the detention facility and show that downstream property owners will not be adversely affected by the concentrated runoff. m. Adequate access shall be provided for maintenance of all detention facilities. n. On a detention pond the steepest fill slopes shall be 2:1, and the steepest cut slopes shall be 2:1. o. Fences a minimum of five (5) feet in height with a minimum ten-foot wide gate will be required on all detention ponds where the sides of the pond have a slope of two (2) horizontal to one (1) vertical or greater and the depth of water in the pond is greater than two (2) feet at one (1) hour after the duration of the storm event. Normally dry headwater pools are exempt from the fencing requirement. 8. Traffic studies shall be required for all nonresidential single lot developments generating more than four thousand (4,000) ADT. Such studies will, at a minimum, address the level of traffic generated by the proposed development and its distribution on the existing road network; and the need for acceleration lanes, deceleration lanes, left turn lanes, other additional lanes and traffic signals on all existing and proposed roadways. 9. Any nonresidential single lot development which results in land-disturbing activities, as defined in Section 3.06.00, shall obtain a permit as required by said section. 10. Nonresidential site development plans shall, at a minimum, contain the following items: a. Name of proposed business. b. Name, address, and phone number of the property owner(s) and developer. c. Name, address, and phone number of the design firm. d. Submittal date and date of most recent revisions. e. Graphic scale. f. Vicinity map, with owner names and zoning of abutting properties. g. North arrow. h. Land lot, section, and district. i. Exact boundary lines of the tract indicated by a heavy line giving lengths and bearings. j. Ground elevations of the tract determined from field surveys or aerial photographs. The basis for the topographical information shall be shown. Contours shall be drawn at intervals of ten (10) feet and shall be mean sea level contours. k. Proposed grading, if different than existing contours. l. Location of the 100-year floodplain, or a statement that no part of the property lies within the 100-year floodplain. m. All existing County roads which abut the property, showing right-of-way and pavement widths. n. Existing easements, city or County lines, utility lines, bridges, street culverts, and similar features. o. Present zoning of the tract, and the zoning of the abutting land. p. Proposed zoning, if different from the existing zoning. q. A statement of the required setbacks for the proposed zoning. r. The front, rear, and side setback lines shown graphically. s. Total acreage of the site. t. State approved design professional's stamp and signature. u. Deceleration lanes at development entrances. v. Dimensions of turning radii. w. The plan, profile, and speed limit for the existing County road at the development entrance, demonstrating that the minimum horizontal and stopping sight distances are satisfied. x. Future right-of-way, if additional right-of-way is required to bring an existing County road up to current standards. y. Detail for paving on right-of-way. z. Curb and gutter detail. aa. Details of temporary construction exits at all construction access points to County roads. bb. Location, size, length, and type of all existing and proposed drainage structures. cc. Drainage area to each inlet point of the drainage system. dd. Hydrology study by state approved professional; if detention ponds are required. ee. Proposed type of water and sanitary sewer service. ff. All water and sewer information in the applicable Water and Sewer Department construction documents or the Board of Health documents. gg. Location of nearest existing fire hydrant. hh. The soil erosion and sedimentation control plan shall be submitted with the commercial site plans. ii. Proposed off-street parking facilities, including dimensions of the parking lot, location of parking spaces, and maneuvering aisles. jj. The proposed finished floor elevations of all buildings. kk. A standard detail of a commercial driveway entering a street. ll. The location, height, and size of any proposed signs. mm.The centerline of the nearest existing driveway or street if there is one within 100 feet of the proposed entrance centerline. nn. Location and mean sea level elevation of the bench mark. oo. Description, by a registered engineer, demonstrating how the method of runoff control will not adversely affect downstream properties. pp. Placement of sidewalks if required or otherwise provided. qq. Names of all utility companies, and indication of whether utilities will be located underground or overhead. rr. Any proposed easements. ss. Certification that a water flow test has been performed specifically for this project within the past twelve-month period of time. 11. Exceptions. For electrical substations, cellular telephone towers, water and sewer pumping stations on sites with a project area measuring less than one and one tenth (1.1) acres, the following items may be eliminated from above listing of required items on site plans: (u), (v), (w), (z), (aa), (dd), (ee), (ff), (gg), (ii), (kk), (mm), (pp), (qq), and (ss).