10.03.10. Procedures for Subdivision Final Plat
About this text
- As published by Municode, current through 2024-03-19
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
A. Generally
1. After completion of physical development of the subdivision or the posting of a performance guarantee for any unfinished or any unacceptable portion, the developer shall submit to the Planning Department seven (7) copies of the final plat (eight (8) copies if on-site wastewater disposal has been provided).
2. The final plat shall be reviewed for conformance with the approved construction plans, the requirements of these regulations, and any special conditions or restrictions imposed by the Planning Department or any other reviewing entity.
3. Final approval shall be granted provided the final plat is substantially the same as the approved construction plans, fulfills all conditions specified by the Planning Department or any other reviewing entity and contains all of the specifications set forth in Sections 10.02.01 and 10.02.03. Approval shall be so indicated on all copies of the final plat, and include the signatures of the Planning Department representative, the reviewing professional and the date of approval.
4. The Planning Department representative and/or other designated reviewing party may find the final plat in conflict with the approved construction plans or with these regulations, requiring the disapproval of the final plat. A statement of the reasons for disapproval shall be placed on all copies of the final plat. The original plat shall be returned to the subdivider. The final plat may be resubmitted for a new review for approval after the corrections noted by the Planning Department and/or other designated reviewing party are made.
B. Recording of the final plat. Once the final plat has been approved and all required improvements complete, or a performance guarantee posted for any improvements not complete, the final plat shall be presented by the developer to the Clerk of the Superior Court of Gordon County for recording.
C. Approval of improvements
1. At the time that all required improvements have been completed, the County shall conduct an inspection of all improvements.
2. If the County finds upon inspection that all improvements meet the requirements of Gordon County, the County Administrator or his designee shall provide written notice of acceptance to the developer. If a performance guarantee has been posted, it shall be released at this time.
3. If the County finds, upon inspection, that the improvements do not meet the requirements of Gordon County, he shall provide the developer with written notice detailing the reasons for his rejection of the improvements.
4. The reviewing professional shall make a review and confirmation of the hydrologic and geometric requirements established in this ordinance and shall conduct a site visit to confirm that the said geometries and hydrologic design will perform based on the specifics of the subject site.
D. Performance guarantees. A developer who wishes to submit a final plat and has not completed the required improvements shall submit a performance guarantee. The amount of such guarantee shall be set by the County based on an estimate of construction costs prepared by the appropriate state approved design professional, and shall be that amount necessary to cover the construction costs of any improvements not finished to meet the standards of these regulations.
E. Warranty. The developer shall provide a warranty to the County for all improvements in the subdivision. Such warranty shall be for a period of twelve (12) months.
F. As-Built Plans
1. Two (2) copies of the as-built plans required by Gordon County for the subdivision shall be submitted by the developer before the final plat is approved.
2. All as-built plans shall be prepared by an appropriate state approved professional certifying a field run survey of as-built conditions.
3. As-built plans that provide plan and profile, vertical grade data, including storm drainage, shall be submitted at the time the project is complete.
G. Official acceptance of improvements
1. After the final plat has been approved and recorded, and performance guarantees have been released, the Gordon County Board of Commissioners may officially accept the subdivision improvements.
2. Such acceptance shall be made as an item of business conducted at a regular meeting of the Gordon County Board of Commissioners.
3. A right-of-way deed and clear title of right-of-way to be deeded to the County must be prepared by the attorney of the person proposing to deed a road(s) to the County per the instructions of the County Attorney.
H. Approval of revisions to a recorded plat. Proposed revisions to a recorded plat which do not affect platted rights-of-way shall be submitted for review and approval by the Planning Department. A revision to a recorded plat shall show the name, phase (if any), date of the recorded subdivision plat being revised, and the exact citation with regard to the County Land Records and the book and page number wherein said plat is recorded. Revisions to a recorded plat which involve platted rights-of-way or other major changes shall be submitted as a preliminary plat.
(Res. of 12-20-11)