A. All development within the County river corridor district shall maintain a natural vegetative buffer except as otherwise provided herein. B. The natural vegetative buffer shall be restored as quickly as possible following any land-disturbing activity within the river corridor. C. Except as noted below, all construction within the buffer area is prohibited. D. Exemptions from protection requirements: 1. Construction of road crossings and utility crossings of river corridors are exempt provided that construction of such road and utility crossings shall meet all requirements of the Erosion and Sedimentation Control Act of 1975, and of the applicable local provisions pertaining to soil erosion and sedimentation control as identified in this ULDC. 2. Land use existing prior to the adoption of this section subject to the following conditions: a. Industrial and commercial uses of river corridors shall not impair the drinking quality of the river water; and b. Industrial and commercial activity within the river corridor shall meet all state and federal environmental rules and regulations. 3. Mining activities if permitted by the Georgia Department of Natural Resources pursuant to the Georgia Surface Mining Act of 1968, as amended. 4. Utilities (except as discussed above in Section 3.04.04(D)(2), if such utilities cannot feasibly be located outside the buffer area (feasibility shall be decided conservatively by the local government), provided that: a. The utilities shall be located as far from the river bank as reasonably possible; b. Installation and maintenance of the utilities shall be such as to protect the integrity of the buffer area as well as is reasonably possible; and c. Utilities shall not impair the drinking quality of the river water. 6. Specific forestry and agricultural activities except as discussed in Section 3.04.04(D)(7) below. 7. The following acceptable uses of river corridors are allowed, provided that such uses do not impair the long-term functions of the protected river or the river corridor: a. Timber production and harvesting, subject to the following conditions: 1. Forestry activity shall be consistent with best management practices established by the Georgia Forestry Commission; and 2. Forestry activity shall not impair the drinking quality of the river water as defined by the Federal Clean Water Act, as amended. b. Wildlife and fisheries management activities consistent with the purposes of O.C.G.A. ยง 12-2-8, Article 1, Chapter 2, Title 12 (as amended). c. Wastewater treatment. d. Recreational usage consistent either with the maintenance of a natural vegetative buffer or with river-dependent recreation. For example, a boat ramp would be consistent with this criterion but a hard-surface tennis court would not. Parking lots are not consistent with this criterion. Paths and walkways within the river corridor are consistent with this criterion. e. Natural water quality treatment or purification. f. Agricultural production and management, subject to the following conditions: 1. Agricultural activity shall be consistent with best management practices established by the Georgia Soil and Water Conservation Commission; 2. Agricultural activity shall not impair the drinking quality of the river water as defined by the Federal Clean Water Act, as amended; and 3. Agricultural activity shall be consistent with all state and federal laws, and all regulations promulgated by the Georgia Department of Agriculture. g. Other uses permitted by the Georgia Department of Natural Resources or under Section 404 of the Clean Water Act, with the exception of inhabitable structures.