Gordon County · Zoning Ordinance
Chapter 4 - SITE DESIGN STANDARDS
4.04.02. General Design Standards for Subdivisions
About this text
- As published by Municode, current through 2024-03-19
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
A. A proposal to subdivide a parcel into five (5) or more lots is considered a conventional or major subdivision. A proposal to subdivide a parcel into four (4) or fewer lots is considered a minor subdivision. The calculation of the number of lots subdivided from the parent tract shall be cumulative.
B. All development shall be on a designated, platted, and recorded lot that meets all standards set forth in this ULDC.
C. The standards for design and layout of conventional subdivisions are contained in this section. The standards for the design and installation of public improvements and infrastructure for subdivisions and all other developments are contained in Chapter 6.
D. A subdivision shall have at least two (2) entrances if the subdivision is planned to have two hundred (200) or more lots.
E. Submittal and procedural requirements regarding preliminary plats and final plats are set forth in Chapter 10.
F. General requirements for potable water system
1. Water mains properly connected with a County approved public water supply system shall be constructed in such a manner to adequately serve all lots shown on the subdivision plat for both residential use and fire protection.
2. All subdivisions shall be required to connect to a County approved public water system when said water system is within two hundred (200) feet radius of the property line of a lot created by a new subdivision development.
3. The subdividing of property resulting in the creation of no more one (1) additional lot, parcel, or tract of land shall be allowed to utilize a domestic primary water supply (on-site well water) in accordance with the rules and regulations of the state department of community health, environmental health division. The sub dividing of property resulting in the creation of more than one (1) additional lot, parcel, or tract of land shall be required to utilize a County approved public water system.
4. All public water facilities shall be installed subject to the policies and procedures of the applicable water and sewer utility provider.
G. General requirements for public sewer system
1. When the subdivision is located within the service area of a public sewerage system, sanitary sewers shall be installed to serve all lots with connection to the public system.
2. All subdivisions shall be required to connect to a County approved public sewer system when said sewer system is within two hundred (200) feet radius of the property line of a lot created by a new subdivision development.
3. Where sanitary sewer service is not available, all lots without connection to the public system shall be developed with a private septic tank system or decentralized wastewater management system consistent with the zoning and minimum lot area requirements of this ULDC or other such larger lot area requirement as may be required by the Board of Health at the time of preliminary plat.
4. The standards for a public sewer system are set forth in Chapter 6.
H. General requirements for all other utilities. The applicant shall make the necessary arrangements with the appropriate utility companies for the installation of utilities to assure that all lots have adequate gas, if available, electrical, cable, and telephone communication services.
History
(Res. of 12-20-11)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.