A temporary building or use in connection with a construction project shall be permitted during the construction period. The following standards shall be met by temporary uses established during construction: A. A building permit shall be required. B. Temporary offices may be located on a construction site to be used for administrative functions during construction, sales functions or sales offices allowing for the sale, resale, or marketing of dwellings, structures, or property within the development in which it is located, or adjacent developments under the same control. C. The proposed construction building shall meet tie-down requirements for mobile structures, and have a contract for sewage pump-out if approved by the Department of Natural Resources, Environmental Protection Division. Construction buildings, equipment, machinery, and materials shall be removed within thirty (30) days of completion of the construction site for which they are permitted. D. On-site outdoor storage of equipment and construction materials shall be allowed during the period of construction. E. Portable toilet facilities shall be provided. F. Construction and demolition debris dumpsters are allowable and are not required to be screened. G. On-site temporary use of structures and equipment for the building of roads, public utilities, and government projects shall be allowed.