--- title: Gordon County Zoning Ordinance, 6.04.01. Generally collection: local-codes id: local-code:gordon-county/zoning/6.04.01 cite_as: Gordon County, Ga., Zoning Ordinance ยง 6.04.01 canonical_url: https://georgiacommons.org/code/local/gordon-county/zoning/6.04.01 md_url: https://georgiacommons.org/code/local/gordon-county/zoning/6.04.01.md text_url: https://georgiacommons.org/code/local/gordon-county/zoning/6.04.01/text source_url: https://library.municode.com/ga/gordon_county/codes/unified_land_development_code date: 2024-03-19 status: active jurisdiction: county:gordon jurisdiction_name: Gordon County county_fips: "13129" corpus_version: local-codes-gordon-county-1c9bbdb767b1 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/gordon-county/zoning/~chapter-6.md previous: https://georgiacommons.org/code/local/gordon-county/zoning/6.03.04.md next: https://georgiacommons.org/code/local/gordon-county/zoning/6.04.02.md index: https://georgiacommons.org/code/local/gordon-county.md branch: zoning edition: As published by Municode, current through 2024-03-19 edition_date_kind: current_through source_publisher: Municode version_id: local-code:gordon-county/zoning/6.04.01@2024-03-19-2e483050c5 --- # Gordon County Zoning Ordinance, 6.04.01. Generally > As published by Municode, current through 2024-03-19 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Chapter 6 - INFRASTRUCTURE IMPROVEMENTS A. Stormwater management structures shall be provided by the developer as required in the County floodplain regulations and soil erosion sedimentation ordinance. B. All proposed stormwater management structures shall be designed and certified by an appropriate state approved professional, and shall be subject to the approval of the County. C. Stormwater management structures shall be designed based on a 25-year storm event. The drainage formula used in design of all drainage structures shall be determined by the developer's appropriate state approved professional and based on sound engineering practice. D. All cross drain pipes under streets carrying live streams and all bridges shall be designed for a 100-year storm event. E. If a new or existing lake is proposed for inclusion in the subdivision, the developer shall submit a breach analysis and show a dam breach zone on the plat. F. Subdrainage structures shall be installed as necessary to control surplus groundwater by intercepting sidehill seepage or lowering or regulating the groundwater level. G. Energy dissipation devices shall be installed at all discharge points of storm drains in compliance with the approved soil erosion and sediment control plan. At a minimum, an area of rip rap six (6) times the pipe diameter in length and two (2) times the pipe diameter in width shall be provided. If the exit velocity from the pipe will exceed ten (10) fps, rip rap set in concrete, stilling basins, baffle wall basins, impact blocks or other energy dissipation devices approved by the County shall be required.