A. Each site shall be analyzed for stormwater runoff flow patterns. B. Where a wet weather stream exists between a proposed road and the building line on a lot, the design professional shall size the driveway culvert as if the driveway was at the lowest point on the lot. C. The construction plans and the final plat shall show the minimum driveway pipe size required. D. Driveway culvert material shall conform to Section 6.04.04 above.